Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />100 <br />1 CNH 8-20.2(1) EQMT & DWGS.rtf <br />2 (******) <br />3 Equipment List and Drawings <br />4 Section 9-29.6 is supplemented with the following: <br />5 <br />6 A) Shop Drawings for Traffic Signal and Luminaire Poles: Within 20 days <br />7 following execution of the contract, or approval of electrical subcontractor, the <br />8 contractor shall submit shop drawings for the traffic signal and luminaire poles <br />9 to be used on the project. Within 20 days following approval of the shop <br />10 drawings, the contractor shall submit a letter to the engineer certifying that the <br />11 poles have been ordered and certifying the manufacturers planned delivery <br />12 date. <br />13 <br />14 B) Equipment Submittal for Traffic Signal Equipment: Within 20 days following <br />15 execution of the contract, the contractor shall submit 3 copies of complete <br />16 catalog data for the following items: <br />17 <br />18 *** <br />19 Junction Boxes <br />20 Junction Box Foundations <br />21 Synthetic Junction Box Leveling Materials <br />22 Load Switches <br />23 Conflict Monitor <br />24 Detector Amplifiers <br />25 Preemption Equipment <br />26 Loop Sealant <br />27 Vehicle & Pedestrian Signal Heads & Hardware <br />28 Service Cabinets <br />29 Terminal Cabinets <br />30 Signal Controllers and Software <br />31 Video Detection Systems <br />32 Fiber Distribution Units <br />33 Fiber Switches <br />34 CCTV Camera System <br />35 <br />36 *** <br />37 <br />38 The equipment shall be approved by the engineer in writing prior to the actual ordering <br />39 of the equipment. <br />40 <br />41 <br />42 <br />43 CNH 8-20.2(9-29.1) CONDUIT.RTF <br />44 Conduit, Innerduct, and Outerduct <br />45 Section 9-29.1 is supplemented with the following: <br />46 <br />47 Pull String <br />48 All conduit shown in the plans, proposed and existing conduit to receive conductors, <br />49 and conduit installed for future use, shall have flat woven polyester tape installed and