My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />100 <br />1 CNH 8-20.2(1) EQMT & DWGS.rtf <br />2 (******) <br />3 Equipment List and Drawings <br />4 Section 9-29.6 is supplemented with the following: <br />5 <br />6 A) Shop Drawings for Traffic Signal and Luminaire Poles: Within 20 days <br />7 following execution of the contract, or approval of electrical subcontractor, the <br />8 contractor shall submit shop drawings for the traffic signal and luminaire poles <br />9 to be used on the project. Within 20 days following approval of the shop <br />10 drawings, the contractor shall submit a letter to the engineer certifying that the <br />11 poles have been ordered and certifying the manufacturers planned delivery <br />12 date. <br />13 <br />14 B) Equipment Submittal for Traffic Signal Equipment: Within 20 days following <br />15 execution of the contract, the contractor shall submit 3 copies of complete <br />16 catalog data for the following items: <br />17 <br />18 *** <br />19 Junction Boxes <br />20 Junction Box Foundations <br />21 Synthetic Junction Box Leveling Materials <br />22 Load Switches <br />23 Conflict Monitor <br />24 Detector Amplifiers <br />25 Preemption Equipment <br />26 Loop Sealant <br />27 Vehicle & Pedestrian Signal Heads & Hardware <br />28 Service Cabinets <br />29 Terminal Cabinets <br />30 Signal Controllers and Software <br />31 Video Detection Systems <br />32 Fiber Distribution Units <br />33 Fiber Switches <br />34 CCTV Camera System <br />35 <br />36 *** <br />37 <br />38 The equipment shall be approved by the engineer in writing prior to the actual ordering <br />39 of the equipment. <br />40 <br />41 <br />42 <br />43 CNH 8-20.2(9-29.1) CONDUIT.RTF <br />44 Conduit, Innerduct, and Outerduct <br />45 Section 9-29.1 is supplemented with the following: <br />46 <br />47 Pull String <br />48 All conduit shown in the plans, proposed and existing conduit to receive conductors, <br />49 and conduit installed for future use, shall have flat woven polyester tape installed and
The URL can be used to link to this page
Your browser does not support the video tag.