My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />99 <br />1 "Type ___ Curb Ramp", per Each. <br />2 <br />3 Above Bid Items do not include the adjacent Curb, Curb and Gutter, Pedestrian Curb or <br />4 Sidewalks. <br />5 <br />6 Any sidewalk not acceptable in the opinion of the Engineer, because of damage, <br />7 defacement, or carelessness on the part of the Contractor shall be removed, replaced and <br />8 paid for in accordance to Section 1-05.7 (Removal of Defective and Unauthorized Work) <br />9 of these provisions. <br />10 <br />11 The placement of the CSBC under the new Cement Conc. Sidewalk shall be measured <br />12 and paid in accordance to Section 4-04. <br />13 <br />14 8-14.GR8 <br />15 Cement Concrete Sidewalks <br />16 <br />17 8-14.3.GR8 <br />18 Construction Requirements <br />19 <br />20 8-14.3.INST1.GR8 <br />21 Section 8-14.3 is supplemented with the following: <br />22 <br />23 8-14.3.OPT2.GR8 <br />24 (January 7, 2019) <br />25 Timing Restrictions <br />26 Curb ramps shall be constructed on one leg of the intersection at a time. The curb ramps <br />27 shall be completed and open to traffic within five calendar days before construction can <br />28 begin on another leg of the intersection unless otherwise allowed by the Engineer. <br />29 <br />30 Unless otherwise allowed by the Engineer, the five calendar day time restriction begins <br />31 when an existing curb ramp for the quadrant or traffic island/median is closed to pedestrian <br />32 use and ends when the quadrant or traffic island/median is fully functional and open for <br />33 pedestrian access. <br />34 <br />35 8-14.3.OPT3.GR8 <br />36 (January 7, 2019) <br />37 Layout and Conformance to Grades <br />38 Using the information provided in the Contract documents, the Contractor shall lay out, <br />39 grade, and form each new curb ramp, sidewalk, and curb and gutter. <br />40 <br />41 8-20.GR8 <br />42 Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and <br />43 Electrical <br />44 <br />45 8-20.2.GR8 <br />46 Materials <br />47 <br />48 8-20.2.INST1.GR8 <br />49 Section 8-20.2 is supplemented with the following: <br />50
The URL can be used to link to this page
Your browser does not support the video tag.