Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />117 <br />1 CNH 8-20.3(17) AS BUILT RECORDS.RTF <br />2 8-20.3(17) As Built Plans <br />3 <br />4 Section 8-20.3(17) shall be supplemented with the following: <br />5 <br />6 The Contractor shall provide the Engineer with a cable route diagram for all installed <br />7 fiber optic and twisted pair cables. The diagram shall show the actual cable routes <br />8 and "meter marks" where each cable enters and exits pull boxes, cable vaults, <br />9 junction boxes, splices and termination points. The Contractor shall record these <br />10 points during cable installation. The diagram shall also include all ITS device locations <br />11 as well as the location and quantity of slack cable. The cable route diagram shall be <br />12 submitted to the Engineer as part of the Fiber Cable Testing documentation. <br />13 <br />14 <br />15 GSL 8-20.3(18) POTHOLING.docx <br />16 (******) <br />17 8-20.3(18) Potholing <br />18 <br />19 Section 8-20.3(2)A is new and is supplemented with the following: <br />20 <br />21 This work consists of exposing underground utility to ascertain the precise horizontal and <br />22 vertical position. After the work is complete, Contractor shall backfill and compact with <br />23 native materials. <br />24 <br />25 Contractor shall contact Call Before You Dig prior to all construction activity. <br />26 <br />27 Contractor shall locate and expose buried utilities to verify location prior to sawcutting <br />28 and/or drilling in area of existing utilities. Contractor shall protect exposed utilities <br />29 throughout the duration of the project. Paved areas shall be restored with temporary <br />30 pavement patch using cold mix (MC 250), ATB or steel plates. Appropriate sediment <br />31 controls shall be implemented to prevent pollution and erosion. <br />32 <br />33 The Contractor is responsible for disposing of any drilling residue or remaining spoil in <br />34 accordance to Section 2-03.3(7)C. Contractor shall pothole existing utilities a minimum of <br />35 3 working days prior to scheduled installation of new permanent work to determine if <br />36 conflict exists. <br />37 <br />38 Potholing will be considered as incidental to the Work that is warranting it. <br />39 <br />40 fCOE 8-20.4 8-20.5 BORING AND TRAFFIC SIGNAL SYSTEM.docx <br />41 (******) <br />42 8-20.4 Measurement <br />43 The first sentence of Section 8-20.4 is revised to read: <br />44 <br />45 No specific unit of measurement will apply to the lump sum items for illumination system, <br />46 intelligent transportation system (ITS), or traffic signal systems, but measurement will be <br />47 for the sum total of all items for a complete system to be furnished and installed. <br />48 <br />49 Section 8-20.4 is supplemented with the following: <br />50