My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />122 <br />1 Plastic Bike Lane Symbol, per each. <br />2 Plastic bike lane turn arrow symbol (white), per Each <br />3 Plastic Bike Route on Sidewalk Symbol, per each <br />4 Plastic Bike Symbol Driveway, per each. <br />5 Plastic Bike-turn Box with green background, per each. <br />6 Plastic Green and White Crosswalk Marking, per linear foot. <br />7 Plastic Helmeted Bicyclist, per each. <br />8 Plastic Sharrow Jog , per each. <br />9 Plastic Sharrow Straight (white on green background), per each. <br />10 Plastic Sharrow Straight with brackets, per each. <br />11 Plastic Sharrow Straight, per each. <br />12 Plastic Sharrow Turn (white on green background), per each. <br />13 Plastic Sharrow Turn, per each. <br />14 Plastic Sharrow Veer (white on green background), per each. <br />15 Plastic Sharrow, per each. <br />16 <br />17 <br />18 COE 8-23 Temp Pvmt Markers.rtf <br />19 SECTION 8-23 TEMPORARY PAVEMENT MARKINGS <br />20 SECTION 8-23 OF THE STANDARD SPECIFICATIONS IS AMENDED BY THE FOLLOWING: <br />21 <br />22 8-23.2MATERIALS <br />23 <br />24 THIS SECTION IS REPLACE BY THE FOLLOWING: <br />25 <br />26 Materials for temporary markings shall be paint or reflectorized aluminum tape, as directed <br />27 by the Engineer and selected from approved materials listed in the Qualified Products List. <br />28 <br />29 Temporary paint should only be used on subsurface pavements and may be paved over. <br />30 <br />31 8-23.5PAYMENT <br />32 <br />33 THIS SECTION IS REPLACED BY THE FOLLOWING: <br />34 <br />35 Temporary Pavement Marking will be paid for under bid item Temporary Pavement <br />36 Marking per linear foot. This shall be full pay for constructing, maintaining, and removing <br />37 temporary lines and markers as specified. No additional compensation will be allowed <br />38 when Contractor is required to repair temporary markings that have been damaged or <br />39 worn. <br />40 <br />41 <br />42 <br />43 Contech 8-26 Retaining Wall.docx <br />44 8-26 CEMENT CONCRETE MODULAR BLOCK RETAINING WALL <br />45 Section 8-26 is vacant and is replaced with the following:
The URL can be used to link to this page
Your browser does not support the video tag.