My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />133 <br />1 8-33.5 Payment <br />2 Private Improvement Restoration, Force Account, as provided in Section 1-09.6. <br />3 <br />4 To provide a common Proposal for all Bidders, the Contracting Agency has entered an amount <br />5 in the Proposal to become a part of the Contractors total Bid. <br />6 <br />7 <br />8 COE 8-36 E-FILES.RTF <br />9 8-36 ELECTRONIC FILES <br />10 Section 8-36 is new and is supplemented by the following: <br />11 <br />12 (******) <br />13 <br />14 When requested by the Contractor, the City will provide an electronic version of the construction <br />15 plans (drawings), for use by the Contractor at the Contractors own risk. In all cases, the <br />16 approved paper construction plans are the official contract documents. If the Contractor wishes <br />17 to use the electronic version of the construction plans for the purposes of providing construction <br />18 surveying of proposed improvements, it shall be the Contractors responsibility to verify that <br />19 any coordinates used from the electronic file exactly match the station and offset location given <br />20 in the contract construction plans. Construction plans are diagrammatic in nature. The <br />21 coordinate locations of the various graphic elements within the electronic files may not <br />22 necessarily be precisely shown with respect to their coordinate position. In all cases, the <br />23 location callouts in the contract construction plans shall govern. <br />24 <br />25 <br />26 END DIVISION8.RTF <br />27 <br />28 END DIVISION 8 <br />29
The URL can be used to link to this page
Your browser does not support the video tag.