My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 10, 2024 <br />A <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1 CONTENTS <br />2 PAGE <br />3 <br />4 <br />5 INTRODUCTION ----------------------------------------------------------------------------------------1 <br />6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br />7 SPECIAL PROVISIONS <br />8 DIVISION 1 <br />9 GENERAL REQUIREMENTS <br />10 Definitions-----------------------------------------------------------------------------------------------2 <br />11 BID PROCEDURES AND CONDITIONS----------------------------------------------------------3 <br />12 BID PROCEDURES AND CONDITIONS----------------------------------------------------------4 <br />13 1-02.2 Plans and Specifications---------------------------------------------------------------------4 <br />14 Proposal Forms----------------------------------------------------------------------------------------4 <br />15 Preparation of Proposal -----------------------------------------------------------------------------5 <br />16 Recycled Materials Proposal-----------------------------------------------------------------------5 <br />17 Bid Deposit----------------------------------------------------------------------------------------------6 <br />18 Withdrawing, Revising, or Supplementing Proposal -----------------------------------------6 <br />19 Irregular Proposals------------------------------------------------------------------------------------7 <br />20 Disqualification of Bidders --------------------------------------------------------------------------8 <br />21 Pre Award Information-------------------------------------------------------------------------------8 <br />22 AWARD AND EXECUTION OF CONTRACT ----------------------------------------------------8 <br />23 Consideration of Bids --------------------------------------------------------------------------------9 <br />24 Identical Bid Totals------------------------------------------------------------------------------------9 <br />25 Execution of Contract --------------------------------------------------------------------------------9 <br />26 Contract Bond----------------------------------------------------------------------------------------10 <br />27 Judicial Review---------------------------------------------------------------------------------------11 <br />28 SCOPE OF THE WORK -----------------------------------------------------------------------------11 <br />29 Coordination of Contract Documents, Plans, Special Provisions, ----------------------11 <br />30 Minor Changes---------------------------------------------------------------------------------------11 <br />31 Variation in Estimated Quantities----------------------------------------------------------------12 <br />32 CONTROL OF WORK--------------------------------------------------------------------------------12 <br />33 Conformity with and Deviations from Plans and Stakes-----------------------------------12 <br />34 Contractor Surveying - Roadway----------------------------------------------------------------12
The URL can be used to link to this page
Your browser does not support the video tag.