My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br />CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 10, 2024 <br />B <br />Category 2: Sensitive information <br />1 Contractor Surveying ADA Features---------------------------------------------------------15 <br />2 Removal of Defective and Unauthorized Work ----------------------------------------------15 <br />3 Final Inspection --------------------------------------------------------------------------------------16 <br />4 One-Year Guarantee Period----------------------------------------------------------------------18 <br />5 Superintendents, Labor and Equipment of Contractor-------------------------------------18 <br />6 Water and Power------------------------------------------------------------------------------------19 <br />7 Record Drawings ------------------------------------------------------------------------------------19 <br />8 CONTROL OF MATERIAL --------------------------------------------------------------------------21 <br />9 Approval of Materials Prior to Use --------------------------------------------------------------21 <br />10 Recycled Materials----------------------------------------------------------------------------------21 <br />11 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC -----------------------21 <br />12 Laws to be Observed-------------------------------------------------------------------------------21 <br />13 State Sales Tax--------------------------------------------------------------------------------------22 <br />14 Sanitation----------------------------------------------------------------------------------------------23 <br />15 Health Hazards---------------------------------------------------------------------------------------23 <br />16 Load Limits--------------------------------------------------------------------------------------------28 <br />17 Requirements For Nondiscrimination ----------------------------------------------------------28 <br />18 Vegetation Protection and Restoration --------------------------------------------------------29 <br />19 Utilities and Similar Facilities ---------------------------------------------------------------------29 <br />20 Public Liability and Property Damage Insurance--------------------------------------------32 <br />21 Excess or Umbrella Liability ----------------------------------------------------------------------35 <br />22 Pollution Liability-------------------------------------------------------------------------------------35 <br />23 Public Convenience and Safety -----------------------------------------------------------------35 <br />24 Construction Under Traffic ------------------------------------------------------------------------36 <br />25 Rights of Way-----------------------------------------------------------------------------------------38 <br />26 PROSECUTION AND PROGRESS---------------------------------------------------------------39 <br />27 Prosecution and Progress-------------------------------------------------------------------------39 <br />28 Preliminary Matters ---------------------------------------------------------------------------------39 <br />29 Preconstruction Conference----------------------------------------------------------------------39 <br />30 Hours of Work----------------------------------------------------------------------------------------40 <br />31 Subcontracting ---------------------------------------------------------------------------------------40 <br />32 Progress Schedule----------------------------------------------------------------------------------41 <br />33 General Requirements-----------------------------------------------------------------------------41
The URL can be used to link to this page
Your browser does not support the video tag.