Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />2 <br />1 additional solar powered advance beacon; plastic pavement line, plastic pavement markings, <br />2 and signage *** and other work, all in accordance with the attached Contract Plans, these <br />3 Contract Provisions, and the Standard Specifications. <br />4 <br />5 <br />6 1-01.3.RTF <br />7 1-01.3 Definitions <br />8 (January 19, 2022 APWA GSP) <br />9 <br />10 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br />11 them with the following: <br />12 <br />13 Dates <br />14 Bid Opening Date <br />15 The date on which the Contracting Agency publicly opens and reads the Bids. <br />16 Award Date <br />17 The date of the formal decision of the Contracting Agency to accept the lowest <br />18 responsible and responsive Bidder for the Work. <br />19 Contract Execution Date <br />20 The date the Contracting Agency officially binds the Agency to the Contract. <br />21 Notice to Proceed Date <br />22 The date stated in the Notice to Proceed on which the Contract time begins. <br />23 Substantial Completion Date <br />24 The day the Engineer determines the Contracting Agency has full and unrestricted <br />25 use and benefit of the facilities, both from the operational and safety standpoint, any <br />26 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br />27 replacement of temporary substitute facilities, plant establishment periods, or <br />28 correction or repair remains for the Physical Completion of the total Contract. <br />29 Physical Completion Date <br />30 The day all of the Work is physically completed on the project. All documentation <br />31 required by the Contract and required by law does not necessarily need to be <br />32 furnished by the Contractor by this date. <br />33 Completion Date <br />34 The day all the Work specified in the Contract is completed and all the obligations of <br />35 the Contractor under the contract are fulfilled by the Contractor. All documentation <br />36 required by the Contract and required by law must be furnished by the Contractor <br />37 before establishment of this date. <br />38 Final Acceptance Date <br />39 The date on which the Contracting Agency accepts the Work as complete. <br />40 <br />41 Supplement this Section with the following: <br />42 <br />43 All references in the Standard Specifications or WSDOT General Special Provisions, to <br />44 the terms Department of Transportation, Washington State Transportation <br />45 Commission, Commission, Secretary of Transportation, Secretary, Headquarters, <br />46 and State Treasurer shall be revised to read Contracting Agency. <br />47 <br />48 All references to the terms State or state shall be revised to read Contracting Agency <br />49 unless the reference is to an administrative agency of the State of Washington, a State <br />50 statute or regulation, or the context reasonably indicates otherwise.