Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />3 <br />1 <br />2 All references to State Materials Laboratory shall be revised to read Contracting <br />3 Agency designated location. <br />4 <br />5 All references to final contract voucher certification shall be interpreted to mean the <br />6 Contracting Agency form(s) by which final payment is authorized, and final completion <br />7 and acceptance granted. <br />8 <br />9 Additive <br />10 A supplemental unit of work or group of bid items, identified separately in the Bid <br />11 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br />12 to the base bid. <br />13 <br />14 Alternate <br />15 One of two or more units of work or groups of bid items, identified separately in the Bid <br />16 Proposal, from which the Contracting Agency may make a choice between different <br />17 methods or material of construction for performing the same work. <br />18 <br />19 Business Day <br />20 A business day is any day from Monday through Friday except holidays as listed in <br />21 Section 1-08.5. <br />22 <br />23 Contract Bond <br />24 The definition in the Standard Specifications for Contract Bond applies to whatever bond <br />25 form(s) are required by the Contract Documents, which may be a combination of a <br />26 Payment Bond and a Performance Bond. <br />27 <br />28 Contract Documents <br />29 See definition for Contract. <br />30 <br />31 Contract Time <br />32 The period of time established by the terms and conditions of the Contract within which <br />33 the Work must be physically completed. <br />34 <br />35 Notice of Award <br />36 The written notice from the Contracting Agency to the successful Bidder signifying the <br />37 Contracting Agencys acceptance of the Bid Proposal. <br />38 <br />39 Notice to Proceed <br />40 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br />41 and directing the Contractor to proceed with the Work and establishing the date on which <br />42 the Contract time begins. <br />43 <br />44 Traffic <br />45 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br />46 equestrian traffic. <br />47 <br />48 1-02.GR1 <br />49 Bid Procedures and Conditions <br />50