My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />4 <br />1 1-02.1.RTF <br />2 1-02 BID PROCEDURES AND CONDITIONS <br />3 <br />4 1-02.1 Prequalification of Bidders <br />5 <br />6 Delete this section and replace it with the following: <br />7 <br />8 1-02.1 Qualifications of Bidder <br />9 (January 24, 2011 APWA GSP) <br />10 <br />11 Before award of a public works contract, a bidder must meet at least the minimum <br />12 qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to <br />13 be awarded a public works project. <br />14 <br />15 COE 1-02.2.RTF <br />16 1-02.2 Plans and Specifications <br />17 (June 27, 2011 APWA GSP) <br />18 <br />19 Delete this section and replace it with the following: <br />20 <br />21 Information as to where Bid Documents can be obtained or reviewed can be found in the <br />22 Call for Bids (Advertisement for Bids) for the work. <br />23 <br />24 After award of the contract, plans and specifications will be issued to the Contractor at no <br />25 cost as detailed below: <br />26 <br />To Prime Contractor No. of Sets Basis of Distribution <br />Reduced plans (11" x 17")5 Furnished automatically <br />upon award. <br />Contract Provisions <br />5 Furnished automatically <br />upon award. <br />Large plans (e.g., 22" x <br />34")3 Furnished only upon <br />request. <br />27 <br />28 Additional plans and Contract Provisions may be obtained by the Contractor from the <br />29 source stated in the Call for Bids, at the Contractors own expense. <br />30 <br />31 1-02.5.RTF <br />32 1-02.5 Proposal Forms <br />33 (July 31, 2017 APWA GSP) <br />34 <br />35 Delete this section and replace it with the following: <br />36 <br />37 The Proposal Form will identify the project and its location and describe the work. It will <br />38 also list estimated quantities, units of measurement, the items of work, and the materials <br />39 to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal <br />40 form that call for, but are not limited to, unit prices; extensions; summations; the total bid
The URL can be used to link to this page
Your browser does not support the video tag.