Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />8 <br />1 1-02.14.Option.A.RTF <br />2 1-02.14 Disqualification of Bidders <br />3 (May 17, 2018 APWA GSP, Option A) <br />4 <br />5 Delete this section and replace it with the following: <br />6 <br />7 A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br />8 responsibility criteria in RCW 39.04.350(1), as amended. <br />9 <br />10 The Contracting Agency will verify that the Bidder meets the mandatory bidder responsibility <br />11 criteria in RCW 39.04.350(1). To assess bidder responsibility, the Contracting Agency <br />12 reserves the right to request documentation as needed from the Bidder and third parties <br />13 concerning the Bidders compliance with the mandatory bidder responsibility criteria. <br />14 <br />15 If the Contracting Agency determines the Bidder does not meet the mandatory bidder <br />16 responsibility criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the <br />17 Contracting Agency shall notify the Bidder in writing, with the reasons for its determination. <br />18 If the Bidder disagrees with this determination, it may appeal the determination within two <br />19 (2) business days of the Contracting Agencys determination by presenting its appeal and <br />20 any additional information to the Contracting Agency. The Contracting Agency will consider <br />21 the appeal and any additional information before issuing its final determination. If the final <br />22 determination affirms that the Bidder is not responsible, the Contracting Agency will not <br />23 execute a contract with any other Bidder until at least two business days after the Bidder <br />24 determined to be not responsible has received the Contracting Agencys final <br />25 determination. <br />26 <br />27 1-02.15.RTF <br />28 1-02.15 Pre Award Information <br />29 (December 30, 2022 APWA GSP) <br />30 <br />31 Revise this section to read: <br />32 <br />33 Before awarding any contract, the Contracting Agency may require one or more of these <br />34 items or actions of the apparent lowest responsible bidder: <br />35 1. A complete statement of the origin, composition, and manufacture of any or all <br />36 materials to be used, <br />37 2. Samples of these materials for quality and fitness tests, <br />38 3. A progress schedule (in a form the Contracting Agency requires) showing the order of <br />39 and time required for the various phases of the work, <br />40 4. A breakdown of costs assigned to any bid item, <br />41 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br />42 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br />43 where the work is located. <br />44 7. Any other information or action taken that is deemed necessary to ensure that the <br />45 bidder is the lowest responsible bidder. <br />46 <br />47 1-03.GR1 <br />48 Award and Execution of Contract <br />49