Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />19 <br />1 1-05.13.RTF <br />2 1-05.13 Superintendents, Labor and Equipment of Contractor <br />3 (August 14, 2013 APWA GSP) <br />4 <br />5 Delete the sixth and seventh paragraphs of this section. <br />6 <br />7 1-05.16.RTF <br />8 Add the following new section: <br />9 <br />10 1-05.16 Water and Power <br />11 (October 1, 2005 APWA GSP) <br />12 <br />13 The Contractor shall make necessary arrangements, and shall bear the costs for power <br />14 and water necessary for the performance of the work, unless the contract includes power <br />15 and water as a pay item. <br />16 <br />17 F1-05.18.docx <br />18 Add the following new section: <br />19 <br />20 1-05.18 Record Drawings <br />21 (March 8, 2013 APWA GSP) <br />22 <br />23 The Contractor shall maintain one set of full size plans for Record Drawings, updated with <br />24 clear and accurate red-lined field revisions on a daily basis, and within 2 business days <br />25 after receipt of information that a change in Work has occurred. The Contractor shall not <br />26 conceal any work until the required information is recorded. <br />27 <br />28 This Record Drawing set shall be used for this purpose alone, shall be kept separate from <br />29 other Plan sheets, and shall be clearly marked as Record Drawings. These Record <br />30 Drawings shall be kept on site at the Contractors field office, and shall be available for <br />31 review by the Contracting Agency at all times. The Contractor shall bring the Record <br />32 Drawings to each progress meeting for review. <br />33 <br />34 The preparation and upkeep of the Record Drawings is to be the assigned responsibility <br />35 of a single, experienced, and qualified individual. The quality of the Record Drawings, in <br />36 terms of accuracy, clarity, and completeness, is to be adequate to allow the Contracting <br />37 Agency to modify the computer-aided drafting (CAD) Contract Drawings to produce a <br />38 complete set of Record Drawings for the Contracting Agency without further investigative <br />39 effort by the Contracting Agency. <br />40 <br />41 The Record Drawing markups shall document all changes in the Work, both concealed <br />42 and visible. Items that must be shown on the markups include but are not limited to: <br />43 <br />44 •Actual dimensions, arrangement, and materials used when different than shown in <br />45 the Plans. <br />46 •Changes made by Change Order or Field Order. <br />47 •Changes made by the Contractor. <br />48 •Accurate locations of storm sewer, sanitary sewer, water mains and other water <br />49 appurtenances, structures, conduits, light standards, vaults, width of roadways, <br />50 sidewalks, landscaping areas, building footprints, channelization and pavement