My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />53 <br />1 <br />2 For rigid base constructed with mortared decorative or special pavement (e.g., <br />3 brick, cobblestone, paver block, etc.) or any combination of such materials the <br />4 depth shall be full thickness of the rigid base along a neat line with intent to <br />5 salvage as many special pavement units as possible. <br />6 <br />7 <br />8 GSL 2-02 SAWCUT.docx <br />9 2-02.5Payment <br />10 <br />11 Section 2-02.5 is supplemented with the following: <br />12 <br />13 (******) <br />14 <br />15 Sawcut, per linear foot. <br />16 <br />17 Saw-cutting shall be performed in accordance with Sections 2-02.3(3). <br />18 <br />19 Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />20 <br />21 The unit price per linear foot for the final saw-cutting of asphalt concrete and cement <br />22 concrete pavement shall be full pay for all labor, materials, tools, and equipment necessary <br />23 to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br />24 Specifications and disposal of cuttings slurry, including vacuum collection. <br />25 <br />26 <br />27 COE 2-02.3(8) Waste Disposal.RTF <br />28 Section 2-02.3(8) is new with the following: <br />29 <br />30 (******) <br />31 2-02.3(8) Waste Disposal (New Section) <br />32 <br />33 The Contractor shall provide the waste site for disposal of materials not required for <br />34 the construction. The Contractor shall arrange to dispose of waste at no expense to <br />35 the City and any such disposal shall meet the requirements of Section 2-03.3(7)C of <br />36 the Standard Specifications. <br />37 <br />38 <br />39 2-02.4.GR2 <br />40 Measurement <br />41 <br />42 2-02.4.INST1.GR2 <br />43 Section 2-02.4 is supplemented with the following: <br />44 <br />45 2-02.4.OPT1.GR2 <br />46 (December 4, 2006) <br />47 Hazardous material excavation including haul will be measured by the cubic yard. All <br />48 excavated material will be measured in the position it occupied before the excavation was <br />49 performed. An original ground measurement will be taken using cross-section or digital
The URL can be used to link to this page
Your browser does not support the video tag.