My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />55 <br />1 <br />2 <br />3 DIVISION4.GR4 <br />4 Division 4 <br />5 Bases <br />6 <br />7 4-04.GR4 <br />8 Ballast and Crushed Surfacing <br />9 <br />10 COE 4-04.1 CSTC&CSBC.RTF <br />11 Section 4-04.1 is supplemented with the following: <br />12 <br />13 4-04.1Description <br />14 <br />15 (******) <br />16 <br />17 Where shown in the Plans, or as directed by the Engineer, the Contractor shall place, <br />18 smooth, and compact "Crushed Surfacing Base Course", and/or "Crushed Surfacing Top <br />19 Course." <br />20 Crushed surfacing can also be used as driveway maintenance, and in gravel driveway <br />21 restoration to a minimum of 3" depth. <br />22 <br />23 All materials, labor, tools, and equipment required to place the crushed surfacing to its final <br />24 grade shall be included in the contract unit price. <br />25 <br />26 END DIVISION4.RTF <br />27 END DIVISION 4 <br />28
The URL can be used to link to this page
Your browser does not support the video tag.