Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />56 <br />1 <br />2 <br />3 DIVISION5.GR5 <br />4 Division 5 <br />5 Surface Treatments and Pavements <br />6 <br />7 5-04.GR5 <br />8 Hot Mix Asphalt <br />9 <br />10 COE 5-04.RTF <br />11 5-04 Hot Mix Asphalt <br />12 (December 3, 2018 City of Everett based on APWA GSP) <br />13 <br />14 Delete Section 5-04 and amendments, Hot Mix Asphalt and replace it with the following: <br />15 <br />16 5-04.1 Description <br />17 This Work shall consist of providing and placing one or more layers of plant mixed hot mix <br />18 asphalt (HMA) on a prepared foundation or base in accordance with these Specifications <br />19 and the lines, grades, thicknesses, and typical cross-sections shown 43X+./X&935) The <br />20 manufacture of HMA may include warm mix asphalt (WMA) processes in accordance with <br />21 these Specifications. WMA processes include organic additives, chemical additives, and <br />22 foaming. <br />23 <br />24 HMA shall be composed of asphalt binder and mineral materials as may :/X*/J%4*/<( <br />25 mixed in the proportions specified to provide a homogeneous, stable, <br />26 93<X01*29:&/X;4D+%*/) <br />27 <br />28 5-04.2 Materials <br />29 Materials shall meet the requirements of the following sections: <br />30 Asphalt Binder 9-02.1(4) <br />31 Cationic Emulsified Asphalt 9-02.1(6) <br />32 Anti-Stripping Additive 9-02.4 <br />33 HMA Additive 9-02.5 <br />34 Aggregates 9-03.8 <br />35 Recycled Asphalt Pavement 9-03.8(3)B <br />36 Mineral Filler 9-03.8(5) <br />37 Recycled Material 9-03.21 <br />38 Portland Cement 9-01 <br />39 Sand 9-03.1(2) <br />40 (As noted in 5-04.3(5)C for crack sealing) <br />41 Joint Sealant 9-04.2 <br />42 Foam Backer Rod 9-04.2(3)A <br />43 The Contract documents may establish that the various mineral materials required for the <br />44 manufacture of HMA will be furnished in whole or in part by the Contracting Agency. If the <br />45 documents do not establish the furnishing of any of these mineral materials by the <br />46 Contracting Agency, the Contractor shall be required to furnish such materials in the