CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />57 <br />1 amounts required for the designated mix. Mineral materials include coarse and fine <br />2 aggregates, and mineral filler. <br />3 <br />4 The Contractor may choose to utilize recycled asphalt pavement (RAP) in the production <br />5 of HMA. The RAP may be from pavements removed under the Contract, if any, or <br />6 pavement material from an existing stockpile. <br />7 <br />8 The Contractor may use up to 20 percent RAP by total weight of HMA with no additional <br />9 sampling or testing of the RAP. The RAP shall be sampled and tested at a frequency of <br />10 one sample for every 1,000 tons produced and not less than ten samples per project. The <br />11 asphalt content and gradation test data shall be reported to the Contracting Agency when <br />12 submitting the mix design for approval on the QPL. The Contractor shall include the RAP <br />13 as part of the mix design as defined in these Specifications. <br />14 <br />15 The grade of asphalt binder shall be as required by the Contract. Blending of asphalt <br />16 binder from different sources is not permitted. <br />17 <br />18 The Contractor may only use warm mix asphalt (WMA) processes in the production of <br />19 HMA with 20 percent or less RAP by total weight of HMA. The Contractor shall submit to <br />20 the Engineer for approval the process that is proposed and how it will be used in the <br />21 manufacture of HMA. <br />22 <br />23 Production of aggregates shall comply with the requirements of Section 3-01. <br />24 Preparation of stockpile site, the stockpiling of aggregates, and the removal of aggregates <br />25 from stockpiles shall comply with the requirements of Section 3-02. <br />26 <br />27 5-04.2(1) How to Get an HMA Mix Design on the QPL <br />28 If the contractor wishes to submit a mix design for inclusion in the Qualified Products List <br />29 (QPL), please follow the WSDOT process outlined in Standard Specification 5-04.2(1). <br />30 <br />31 5-04.2(2) Mix Design Obtaining Project Approval <br />32 No paving shall begin prior to the approval of the mix design by the Engineer. <br />33 <br />34 Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA in <br />35 the contract documents. <br />36 <br />37 Commercial evaluation will be used for Commercial HMA and for other classes of HMA <br />38 in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, <br />39 gores, prelevel, and pavement repair. Other nonstructural applications of HMA accepted <br />40 by commercial evaluation shall be as approved by the Project Engineer. Sampling and <br />41 testing of HMA accepted by commercial evaluation will be at the option of the Project <br />42 Engineer. The Proposal quantity of HMA that is accepted by commercial evaluation will be <br />43 excluded from the quantities used in the determination of nonstatistical evaluation. <br />44 <br />45 Nonstatistical Mix Design. Fifteen days prior to the first day of paving the contractor <br />46 shall provide one of the following mix design verification certifications for Contracting <br />47 Agency review; <br />48