Laserfiche WebLink
5/31/24,8:03 AM Mechanical Compliance Summary <br /> MECHANICAL COMPLIANCE SUMMARY <br /> 2021 WSEC Compliance Forms for Commercial Buildings including Group R1,R2,and Group R3&R4 over 3 stories Administered by:@2021 NEEA,All rights reserved <br /> Project Title 210 SW Everett Mall Way-2021 WSEC For Building Department Use: I Date: May 31,2024 <br /> Project Address 210 SW Everett Mall Way <br /> Project&Applicant Everett,WA 98208 <br /> Information Applicant Name Alex Burkhart <br /> Applicant Phone 206-763-1744 <br /> Applicant Email alexb@evergreenhvac.com <br /> Mechanical Compliance Summary Scope-Compliance verification provided in this report is limited to code minimum efficiency requirements for mechanical equipment types defined in Tables C403.3.2(1)through C403.3.2(16)of the 2021 <br /> WSEC-C.This includes efficiency multipliers for economizer exceptions.Performance criteria for additional energy efficiency and load management measures ARE NOT included in this report.Additional documentation is required to <br /> demonstrate compliance with all other provisions of the energy code,including better than code efficiency criteria for Section C406.For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at <br /> com.techsupport@waenergycodes.com. <br /> General Occupancy All Commercial General Building Use Type(s) Retail,General Sales Building Cond.Floor Area 10,928 <br /> New Building Project Cond.Floor Area 10,928 <br /> General Project Types Alteration or Addition Alteration Single Zone Systems&Equipment Floors Above Grade 1 <br /> Mechanical ScopeMechanical Scope <br /> Overall Compliance Path General Prescriptive <br /> Mechanical Project Description Installation of six(6)replacement rooftop units. <br /> Economizer Exception(s) DOAS Ventilation Equipment Efficiency <br /> Project Type Mechanical Scope lied?A Provided? <br /> Mechanical Compliance Applied? Compliance Verification <br /> Scope and Method Single Zone Systems& <br /> Alteration Yes No COMPLIES <br /> Equipment <br /> Additional Energy Efficiency Load Management Measures <br /> Measures(AEM) No mechanical additional energy efficiency measures included in project (LDM) No mechanical load management measures included in project <br /> Does building include occupancy classifications requiring DOAS? No Does project include DOAS equipment? No <br /> Do all systems comply with Appendix D standard reference design <br /> Based on project scope do TSPR requirements apply? No No <br /> or qualify for an exception to TSPR? <br /> Scope&Space Conditioning ALTERATION-SINGLE ZONE SYSTEMS&EQUIPMENT Compliance Verification COMPLIES <br /> Single Zone Air Systems Category-Air conditioner,split&single package,SC,SDHV <br /> Air Systems Summary Information <br /> Ventilation CFM <br /> Quantity Supply Airflow Ventilation Energy Recovery <br /> System/Equip ID Ventilation Standard (Total if Multiple Paired with DOAS Ventilation energy recovery <br /> of Items Control Items) Air Source Efficiency(%) <br /> RTU-1 Constant volume IMC Ventilation Integral Not provided,not required <br /> RTU-2 Constant volume IMC Ventilation Integral Not provided,not required <br /> RTU-31 I Constant volume IMC Ventilation Integral Not provided,not required <br /> RTU-4 Constant volume IMC Ventilation Integral Not provided,not required <br /> RTU-5 Constant volume IMC Ventilation Integral Not provided,not required <br /> RTU-6 Constant volume IMC Ventilation Integral Not provided,not required <br /> Air Systems&Equipment-Cooling <br /> https://waenergycodes.com/print_project_summary_form/mec?project_id=26574&form_version_id=24 1/3 <br />