Laserfiche WebLink
Mechanical Requirements • • of <br /> 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> NA C406.2.2,3 More efficient In addition to system selection requirement, <br /> C406.2.2.3.2 HVAC equipment demonstrate that 90%or more of all HVAC <br /> heating performance heating capacity serving the building or credit <br /> area is delivered by equipment at least 5% <br /> better than the listed WSEC efficiency, <br /> seasonal or annualized where available other <br /> wise use full load efficiency <br /> NA C406.2.2.3 More efficient For projects prorating the credit in <br /> C406.2.2.3.2 HVAC equipment accordance per Equation 4-16 include <br /> heating performance calculations for equipment representing at <br /> least 90%of the heating capacity serving the <br /> building or credit area that demonstrate the <br /> capacity weighted average better than code <br /> efficiency;for equipment with multiple code <br /> requirements the seasonal or annualized <br /> efficiency shall be used <br /> NA C406.2.2.3 More efficient In C402.1.1 low energy and C402.1.1.2 semi- <br /> C406.2.2.3.2 HVAC equipment heated spaces demonstrate that 90%of the <br /> heating performance heating capacity in the building or area is <br /> provided by electric infrared or gas-fired <br /> radiant equipment for localized heating <br /> applications. <br /> VENTILATION,EXHAUST&ENERGY RECOVERY <br /> NA C403.7.1.2 Demand control For each required demand control ventilation <br /> ventilation design system,indicate outdoor air automatically <br /> changes in response to a CO2 sensor and <br /> utilizes a variable speed fan control to reduce <br /> systems flow;or exception applied <br /> C403.2.2.1 Ventilation If mechanically delivered,indicate that <br /> ventilation systems are configured to provide <br /> not more than 150%of,but at least the <br /> minimum required volume of outdoor air to <br /> each zone per IMC,ASHRAE 62.1 or other <br /> applicable code(WAC,OSHA,etc.);or <br /> exception applied <br /> C403.2.2.1 Ventilation If delivered via natural ventilation,identify <br /> required elements per IMC including: <br /> minimum openable area to the outdoors or <br /> qualifying adjoining spaces;criteria for <br /> ensuring required ventilation is provided <br /> during all occupied hours of the year <br /> (including during inclement outdoor <br /> conditions) <br /> C403.2.2.2 Exhaust Indicate that exhaust systems are configured <br /> to provide not more than 150%of,but at least <br /> the minimum required volume from each <br /> zone per IMC,or other applicable code <br /> (WAC,OSHA,etc.);or exception applied <br /> C403.4.2.4 Exhaust system off- Refer to Requirements List section HVAC <br /> hour controls Controls for off-hour controls requirements <br /> for exhaust systems <br /> Page 9132 <br />