My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
210 SW EVERETT MALL WAY BASE FILE 2024-10-11
>
Address Records
>
SW EVERETT MALL WAY
>
210
>
BASE FILE
>
210 SW EVERETT MALL WAY BASE FILE 2024-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 1:45:46 PM
Creation date
9/16/2024 3:50:40 PM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
210
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • of <br /> 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> C403.6.6 Parallel fan powered Indicate controls automatically activate or <br /> VAV air terminals shut off the air terminal fan based on call for <br /> heating and/or ventilation;indicate controls <br /> are configured to activate the terminal fan as <br /> the first stage of heating prior to activating the <br /> heating coil;indicate control method of <br /> primary air during warmup or temperature <br /> setback mode <br /> HIGH EFFICIENCY MULTIPLE-ZONE VAV SYSTEMS-EXCEPTION TO C403.3.5 DOAS,MUST COMPLY WITH ALL 15 <br /> PROVISIONS TO BE ELIGIBLE <br /> C403.6.10, Minimum area served Indicate that each high efficiency multiple- <br /> Item 1 and zoning zone VAV systems serves an area>_3,000 sf <br /> and includes>_5 zones <br /> C403.6.10, Air economizer Indicate system is configured for 100%air <br /> Item 2 economizer operation and complies with all <br /> related economizer requirements per C403.5 <br /> (without economizer exceptions) <br /> C403.6.10, Direct digital controls Provide DDC controls for all components of <br /> Item 3 (DDC) system per C403.4.11 (regardless of system <br /> size);identify all DDC system input/output <br /> control points;indicate capability for trending <br /> and graphical display <br /> C403.6.10, Supply and outdoor For systems with minimum required outdoor <br /> Items 4 and 5 airflow measurement air>2,500 cfm,provide an airflow <br /> and control monitoring station that is configured to <br /> measure outdoor air intake under all load <br /> conditions;indicate control sequence that <br /> increases or reduces outdoor air cfm based on <br /> VAV terminal feedback of ventilation <br /> efficiency(per C403.6.5 without exceptions) <br /> or and DCV(per C403.7.1) <br /> C403.6.10, Supply and outdoor Provide a supply airflow monitoring station <br /> Items 4 and 5 airflow measurement that is configured to measure supply air <br /> and control delivered to VAV terminals under all load <br /> conditions <br /> C403.6.I0,I Zone isolation and Verify maximum area served by a single VAV <br /> tem 6 maximum area served system is<_50,000 sf,or one entire floor, <br /> whichever is greater;in addition if a system <br /> serves>25,000 sf,that includes areas that are <br /> expected to be occupied non-simultaneously, <br /> indicate zone isolation controls per C403.2.1 <br /> C403.6.10, Interior/exterior Verify that VAV terminals serving interior <br /> Item 7 zone design supply air cooling driven loads are sized per a design <br /> temperature supply air temperature that is 5'F higher than <br /> VAV terminals serving exterior zones while in <br /> cooling mode <br /> C403.6.10, Maximum air Identify all air terminals with minimum <br /> Item 8 terminal inlet velocity primary airflow setpoints>50%of maximum <br /> setpoint in mechanical equipment schedule <br /> for these air terminals indicate inlet velocity <br /> does not exceed 900 fpm <br /> Page 27132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.