My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
210 SW EVERETT MALL WAY BASE FILE 2024-10-11
>
Address Records
>
SW EVERETT MALL WAY
>
210
>
BASE FILE
>
210 SW EVERETT MALL WAY BASE FILE 2024-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 1:45:46 PM
Creation date
9/16/2024 3:50:40 PM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
210
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • of <br /> 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> C403.11.1 Heating outside a Indicate occupancy sensing or timer switch <br /> building controls configured to automatically shut off <br /> heating system when area served is <br /> unoccupied <br /> C403.11.2 Snow melt systems Indicate automatic controls configured to shut <br /> off system when pavement temperature <br /> exceeds 50°F and no precipitation is falling, <br /> and when outdoor air temperature exceeds <br /> 40°F <br /> C403.11.3 Freeze protection Indicate automatic controls to shut off system <br /> system controls when outdoor temperature exceeds 40°F,or <br /> conditions protect fluid from freezing <br /> HVAC EQUIPMENT ENERGY USE METERING <br /> C409.3.1 HVAC equipment For new buildings and building additions> <br /> energy use metering 25,000 sf,verify energy use metering of all <br /> equipment used to provide space heating and <br /> cooling,dehumidification and ventilation will <br /> be provided per C409;indicate equipment <br /> eligible for exception <br /> DOCUMENTATION AND SYSTEM SPECIFIC REQUIREMENT TO SUPPORT COMMISSIONING(CX) <br /> C408.1 Scope of mechanical For buildings with areas required to comply <br /> systems with C403.3.5(DOAS)or with>_ 180,000 <br /> commissioning Btu/h total output cooling capacity or <br /> >240,000 Btu/h total output heating capacity <br /> or energy recovery equipment>_300 cfm, <br /> indicate that all mechanical systems regardless <br /> of individual capacity are required to be <br /> commissioned;or provide building heating/ <br /> cooling capacity calculation demonstrating <br /> eligibility for exception <br /> C408.1 Scope of mechanical Indicate that all systems,equipment and <br /> systems controls for which the WSEC requires control <br /> commissioning functions and/or configuration to perform <br /> specific functions are included in the Cx <br /> scope <br /> C408.1.1 Commissioning Indicate in plans and specifications that Cx <br /> C408.1.4.1 requirements in per C408 is required for all applicable <br /> construction mechanical systems <br /> documents <br /> C408.1.1 Commissioning Include general summary that includes at <br /> C408.1.4.1 requirements in minimum:narrative description of activities, <br /> construction responsibilities of the Cx team,schedule of <br /> documents activities including verification of project <br /> close out documentation per C103.6,and <br /> conflict of interest plan(if required) <br /> C408.1.1 Commissioning Include in general summary that a Cx project <br /> C408.1.4.1 requirements in report or Compliance Checklist(Figure <br /> construction C408.1.4.1)shall be completed by the <br /> documents Certified Cx Professional and provided to the <br /> owner prior to the final mechanical <br /> inspection. <br /> Page 31132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.