Laserfiche WebLink
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 1 COE INTRO OptionA.RTF 1 INTRODUCTION TO THE SPECIAL PROVISIONS 2 3 4 5 (January 4, 2024 APWA GSP, Option A) 6 7 The work on this project shall be accomplished in accordance with the Standard Specifications 8 for Road, Bridge and Municipal Construction, 2024 edition, as issued by the Washington State 9 Department of Transportation (WSDOT) and the American Public Works Association (APWA), 10 Washington State Chapter (hereafter “Standard Specifications”). The Standard 11 Specifications, as modified or supplemented by these Special Provisions, all of which are 12 made a part of the Contract Documents, shall govern all of the Work. 13 14 These Special Provisions are made up of both General Special Provisions (GSPs) from 15 various sources, which may have project-specific fill-ins; and project-specific Special 16 Provisions. Each Provision either supplements, modifies, or replaces the comparable 17 Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition 18 to any subsection or portion of the Standard Specifications is meant to pertain only to that 19 particular portion of the section, and in no way should it be interpreted that the balance of the 20 section does not apply. 21 22 The GSPs are labeled under the headers of each GSP, with the effective date of the GSP and 23 its source. For example: 24 25 (March 8, 2013 APWA GSP) 26 (April 1, 2013 WSDOTGSP) 27 (May 1, 2013 City of Everett COE GSP)Agency Special Provision 28 29 30 Project specific special provisions are labeled without a date as such: 31 (*****) 32 33 Also incorporated into the Contract Documents by reference are: 34 • Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted 35 edition, with Washington State modifications, if any 36 • Standard Plans for Road, Bridge and Municipal Construction, WSDOT Manual 37 M21-01, current edition 38 • Design and Construction Standards & Specifications for Development, City of Everett, 39 current edition 40 41 Contractor shall obtain copies of these publications, at Contractor’s own expense. 42 43 DIVISION1.GR1 44 Division 1 45 General Requirements 46 47 DESWORK.GR1 48 DESCRIPTION OF WORK 49 50