My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 39 The Contractor may use up to 20 percent RAP by total weight of HMA with no additional 1 sampling or testing of the RAP. The RAP shall be sampled and tested at a frequency of 2 one sample for every 1,000 tons produced and not less than ten samples per project. 3 The asphalt content and gradation test data shall be reported to the Contracting Agency 4 when submitting the mix design for approval on the QPL. The Contractor shall include 5 the RAP as part of the mix design as defined in these Specifications. 6 7 The grade of asphalt binder shall be as required by the Contract. Blending of asphalt 8 binder from different sources is not permitted. 9 10 The Contractor may only use warm mix asphalt (WMA) processes in the production of 11 HMA with 20 percent or less RAP by total weight of HMA. The Contractor shall submit to 12 the Engineer for approval the process that is proposed and how it will be used in the 13 manufacture of HMA. 14 15 Production of aggregates shall comply with the requirements of Section 3-01. 16 Preparation of stockpile site, the stockpiling of aggregates, and the removal of 17 aggregates from stockpiles shall comply with the requirements of Section 3-02. 18 19 5-04.2(1) How to Get an HMA Mix Design on the QPL 20 If the contractor wishes to submit a mix design for inclusion in the Qualified Products List 21 (QPL), please follow the WSDOT process outlined in Standard Specification 5-04.2(1). 22 23 5-04.2(2) Mix Design – Obtaining Project Approval 24 No paving shall begin prior to the approval of the mix design by the Engineer. 25 26 Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA 27 in the contract documents. 28 29 Commercial evaluation will be used for Commercial HMA and for other classes of HMA 30 in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, 31 gores, prelevel, and pavement repair. Other nonstructural applications of HMA accepted 32 by commercial evaluation shall be as approved by the Project Engineer. Sampling and 33 testing of HMA accepted by commercial evaluation will be at the option of the Project 34 Engineer. The Proposal quantity of HMA that is accepted by commercial evaluation will 35 be excluded from the quantities used in the determination of nonstatistical evaluation. 36 37 Nonstatistical Mix Design. Fifteen days prior to the first day of paving the contractor 38 shall provide one of the following mix design verification certifications for Contracting 39 Agency review; 40 41 • The WSDOT Mix Design Evaluation Report from the current WSDOT QPL, or 42 one of the mix design verification certifications listed below. 43 • The proposed HMA mix design on WSDOT Form 350-042 with the seal and 44 certification (stamp & signature) of a valid licensed Washington State 45 Professional Engineer. 46 • The Mix Design Report for the proposed HMA mix design developed by a 47 qualified City or County laboratory that is within one year of the approval date.** 48
The URL can be used to link to this page
Your browser does not support the video tag.