My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 38 1 2 COE 5-04.RTF 3 5-04 Hot Mix Asphalt 4 (December 3, 2018 City of Everett based on APWA GSP) 5 6 Delete Section 5-04 and amendments, Hot Mix Asphalt and replace it with the following: 7 8 5-04.1 Description 9 This Work shall consist of providing and placing one or more layers of plant mixed hot 10 mix asphalt (HMA) on a prepared foundation or base in accordance with these 11 Specifications and the lines, grades, thicknesses, and typical cross-sections shown 12 in the Plans. The manufacture of HMA may include warm mix asphalt (WMA) processes 13 in accordance with these Specifications. WMA processes include organic additives, 14 chemical additives, and foaming. 15 16 HMA shall be composed of asphalt binder and mineral materials as may be required, 17 mixed in the proportions specified to provide a homogeneous, stable, 18 and workable mixture. 19 20 5-04.2 Materials 21 Materials shall meet the requirements of the following sections: 22 Asphalt Binder 9-02.1(4) 23 Cationic Emulsified Asphalt 9-02.1(6) 24 Anti-Stripping Additive 9-02.4 25 HMA Additive 9-02.5 26 Aggregates 9-03.8 27 Recycled Asphalt Pavement 9-03.8(3)B 28 Mineral Filler 9-03.8(5) 29 Recycled Material 9-03.21 30 Portland Cement 9-01 31 Sand 9-03.1(2) 32 (As noted in 5-04.3(5)C for crack sealing) 33 Joint Sealant 9-04.2 34 Foam Backer Rod 9-04.2(3)A 35 The Contract documents may establish that the various mineral materials required for 36 the manufacture of HMA will be furnished in whole or in part by the Contracting Agency. 37 If the documents do not establish the furnishing of any of these mineral materials by the 38 Contracting Agency, the Contractor shall be required to furnish such materials in the 39 amounts required for the designated mix. Mineral materials include coarse and fine 40 aggregates, and mineral filler. 41 42 The Contractor may choose to utilize recycled asphalt pavement (RAP) in the production 43 of HMA. The RAP may be from pavements removed under the Contract, if any, or 44 pavement material from an existing stockpile. 45 46
The URL can be used to link to this page
Your browser does not support the video tag.