My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 77 1 8-26.4 Measurement 2 Measurement of “Cement Concrete Modular Block Unit Retaining Wall” shall be per 3 square foot of retaining wall surface using the full wall height (top of base leveling pad 4 to the top of the final course); no further payment will be made except as shown in the 5 paragraph “exclusions” below. 6 7 Including: Base leveling pad, compaction, unit drainage fill, CMB units and shear 8 connectors, reinforced backfill, bond breaker geotextile, and other miscellaneous 9 supplies. 10 11 8-26.5 Payment 12 The unit contract price per square foot for “Cement Concrete Modular Block Unit 13 Retaining Wall” shall be full compensation for furnishing all material, labor, tools, and 14 equipment necessary to construct the Cement Concrete Modular Block Unit Retaining 15 Wall including, but not limited to, shop drawings, excavation, base leveling pad, 16 compaction, unit drainage fill, CMB units and shear connectors, geogrid soil 17 reinforcement, reinforced backfill, and bond breaker geotextile as shown in detail on 18 plans or as directed by the Engineer. Restoration of adjacent landscaping not included 19 in the payment. 20 21 22 23 24 25 END DIVISION8.RTF 26 27 END DIVISION 8 28 29
The URL can be used to link to this page
Your browser does not support the video tag.