GENERAL STRUCTURAL NOTES ABBREVIATIONS SPECIAL INSPECTIONS SCHEDULE
<br /> DESIGN CRITERIA HELICAL PILES AB ANCHOR BOLT FTG FOOTING (
<br /> CODE:2018 IRC/IBC 8 AMENDMENTS AS ADOPTED BY THE REVIEWING AGENCY/COUNTY. 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONALSPECIAL INSPECTIONS TABLES PER THE 2018 IBC.ALL ITEMS NON-APPLICABLE ITEMS HAVE BEEN '+
<br /> ABV ABOVE GA GAUGE _
<br /> MARKED WITH A"-'.ITEMS REQUIRING SPECIAL INSPECTION HAVE BEEN MARKED WITH AN'X'. "'.-R,- •�
<br /> ROOF 25 PSF SNOW(GROUND) BUILDING CODE(IBC). AFF ABOVE FINISH FLOOR GALV GALVANIZED :_ya�-t"••
<br /> FLOORS 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING,INC.,AND SHALL BE ALT ALTERNATE GLB GLULAM BEAM "
<br /> RESIDENTIAL 40 PSF IN ACCORDANCE WITH ESR-3750. ALUM ALUMINUM GR GRADE TABLE 1705.3
<br /> REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
<br /> BALCONY/DECK 60 PSF 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. APPROX APPROXIMATE GYP GYPSUM WALL BOARD
<br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE AYC ALASKAN YELLOW CEDAR HDG HOT-DIPPED GALVANIZED CONTINUOUS PERIODIC SPECIAL REFERENCED IBC
<br /> GENERAL CONDITIONS CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA) BB BOX BEAM HDR HEADER TYPE
<br /> INSPECTION INSPECTION STANDARD' REFERENCE
<br /> COATINGS(AC228). BF BOTTOM FLUSH1 inspect reinforcement,ncwm prestressing ACI 318 Cl.20.252 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL HF HEM FIR tens.am verify piacemen�p - - 25.3.26.5.1-26-53 t d
<br /> ENGINEER OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE BLDG BUILDING HGT HEIGHT 2 Reinforcing bar welding
<br /> 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE REINFORCING STEEL,BUILDING STRUCTURAL STEEL,OR ANY OTHER METAL BUILDING COMPONENTS PER BLKG BLOCKING HT HEIGHT a Verity welaaowry or reinforcing oars _ _
<br /> other man ASTM A 706: AWS 01 4
<br /> STARTING WORK.THE ARCHITECT/ENGINEER SHALL IMMEDIATELY BE NOTIFIED IN WRITING OF ANY AC358 SECTION 3.9. BM BEAM IN INCH 1 Inspect single-pass meet welds maximum AC1318.2654
<br /> s
<br /> DISCREPANCIES. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. BOT BOTTOM JT JOINT ris-and -
<br /> 3. ALL OMISSIONS OR CONFLICT'S BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL 7. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAY BE USED. BP BOTTOM PLATE MAX MAXIMUM c Inspect all other welds - -
<br /> BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF BRG BEARING MIN MINIMUM 3 Inspect anchors cast in concrete. - - ACI 318 1782 - I t
<br /> Inspect anchors posLlnstallea In hardened LJJ
<br /> PROCEEDING WITH ANY WORK SO INVOLVED. INCLINATION OF TI-1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. BTWN BETWEEN MISC MISCELLANEOUS caame members o .- 6
<br /> 4. IN CASE OF CONFLICT, NOTES AND DETAILS OF THESE STRUCTURAL DRAWINGS SHALL TAKE 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION.PROVIDE TORQUE MONITORING DEVICE AS PART OF BSMT BASEMENT a AdhesWe anchors Installed In 000000tally NB NON-BEARING or upwadry m[niled onentallotls 10 resist - - AC1318 17824 - -' H m
<br /> PRECEDENCE OVER THE"GENERAL NOTES"AND/OR"STANDARD DETAILS". THE INSTALLING UNIT.MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE B/W BOTTOM OF WALL sustained tension wads NO NUMBER z o
<br /> CANT CANTILEVER b Mechanical anchors and adhesive anchors - -
<br /> 5. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK,THE CONSTRUCTION SHALL BE THE AT SPECIFIC DEPTHS. OC ON CENTER not dennP3 in 4 a H > t7
<br /> Cl CONTROL JOINT AC131R.Ch 19 19041,1904.2, -
<br /> SAME AS FOR SIMILAR WORK. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE PSF POUNDS PER SQUARE FOOT 5 Verity use SI required design m0 - - 2643.26 44 19082.19093 �rt•�
<br /> CLG. CEILING 6 p/Ibf to concrete laceinent.tabeate s inmefm4 V I- uwl
<br /> 6. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS PSI POUNDS PER SQUARE INCH Mr tests.placement.
<br /> alp ASTM C 172 w
<br /> CU CEILING JOIST - - ASTM C 31 190810 W z
<br /> THAN TWO(2).THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL PT PRESSURE TREATED con1em tests and determine the temperature of ACI 318:26.45 2612 z c7 DRAWINGS. () CLR CLEAR the concrete
<br /> 7. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. CMU CONCRETE MASONRY UNIT RAF RAFTER 7 Inspect concrete and shacrete placement for - - AC1318.-26.45 19086,1908.7, O O W
<br /> CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE 11. ALL BRACKE:TSAND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TOACHIEVE REF REFERENCE overeyelalnrantecnnques19088 J
<br /> COL COLUMN 8 Verify maintenance a spemlied curing - ACI 318.26.4 7-2&d 9 1908.9
<br /> DISTRESS TO THE STRUCTURE. THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2). CONC CONCRETE REINF REINFORCEMENT temperature and lecnnques -
<br /> 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY 9 Inspect prestress w concrete for
<br /> 8. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE COIN CONNECTION REQD REQUIRED a Appncaan o1 prestressing tomes.and - - ACI 318 26921 -
<br /> FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. CONST CONSTRUCTION SF SQUARE FOOT 0.Grouting of bonded presrressnng lend.*nc - - Act 318 26.9.23 - -
<br /> 10 Inspect erection of precast concrete members. ACI 318 Ch.268
<br /> ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE CONT CONTINUOUS SIM SIMILAR 11 verity m-snu concrete strength prior to stressing 4(4
<br /> ortendonsmposi-tenswse0concreteand 9. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE REQUIRED FOR INSTALLATK)N AND ALL INDUCED STRESSES. CT0. CENTE0. SPF SPRUCE PINE FIR prior fo removal a snoresand farms horn - Act318.26102 -
<br /> INTERNATIONAL BUILDING CODE,AND ALL OTHER REGULATING AGENCIES EXERCISING AUTHORITY OVER 14. THE PILE QUANTITY,LAYOUT,AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT DET DETAIL STD STANDARD teams and structural slabs
<br /> 12.Inspectdmens formwork for shape member and
<br /> ANY PORTION OF THE WORK. WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. OF DOUGLAS FIR(SOUTH) SYP SOUTHERN YELLOW PINE ao a me commie member being - - ACI 318 26.10.1(b) -
<br /> ed
<br /> 10. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O15AND 2018 IBC SECTION 1705.9 MUST BE DEL DOUGLAS FIR LARCH T/ TOP OF
<br /> WHERE THE NOTES,DRAWINGS,AND/OR SPECIFICATIONS DIFFER,THE MORE STRINGENT REQUIREMENT PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS.ITEMS TO BE DIM DIMENSION T/C TOP OF CONCRETE TABLE 1706.7
<br /> RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: DJ DOUBLE JOIST REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN DEEP FOUNDATION ELEMENTS
<br /> SHALL APPLY. T/P TOP OF PLATE
<br /> A. PRODUCT MANUFACTURER DIA DIAMETER TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION - •
<br /> 11. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES DN DOWN T/S TOP OF STEEL 1.verity element rtidlerlal5 saes and lengths comply with X
<br /> B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS me it element m -
<br /> OR THE STRUCTURAL DRAWINGS. TAY TOP OF WALL
<br /> C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,EXTENSIONS, DS DOWN SPOUT 2 Determineeapacmes of test elements and cawuct x
<br /> 12. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION, 7TOP FLUSH addsionam load tests as required -
<br /> BRACKETS,BOLTS,THREADED RODS,NUTS,WASHERS,AND TORQUES AS SPECIFIED IN THIS EA EACH 3.Inspect dIni g operations and maintain compete and
<br /> 13. DISCREPANCIES FOUND BETWEEN STRUCTURAL DRAWINGS AND OTHER DOCUMENTS ARE TO BE NOTED EF EACH FACE TJ TRIPLE JOIST accurate recess for each element
<br /> -
<br /> REPORT AND THE CONSTRUCTION DOCUMENTS .
<br /> IN WRITING TO THE ENGINEER PRIOR TO CONSTRUCTION. T/BM TOP OF BEAM 4 Venly placement wcamor18 and p1umbness confirm
<br /> D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT,INSTALLATION EQUIPMENT USED,AND EJ EXPANSION JOINT type alto sax a ham
<br /> mer.record number of down per
<br /> 14. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS,METHODS,AND WORKMANSHIP ACCEPTED AS toot a T/SLABTOP OF SLAB ro penetrator.determine required p000ll to -
<br /> THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS ELEV ELEVATION achieve aesgr capacity record up and din elevations
<br /> GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY IN CONFORMANCE TO THE PROVISIONS OF THE EN EDGE NAILING(PANEL) TP TOPPIATE anddaumentanydamagetowundatwnelement
<br /> E. ANTICIPATED AND ACTUAL PILING DEPTH 5 For steel elements perform addmtlonal specal
<br /> "INTERNATIONAL BUILDING CODE"(IBC),AND STANDARDS REFERENCED THEREIN. EQEQUAL TYP TYPICAL - -
<br /> F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION m cam
<br /> a eccedaee with Section n05-
<br /> 15. STRUCTURAL STABILITY OF ALL NEW AND EXISTING STRUCTURES DURING CONSTRUCTION SHALL BE ES EACH SIDE LINO UNLESS NOTED OTHERWISE 6 For cm leste Niemen*and cserele-mined elements.
<br /> THE RESPONSIBILITY OF THE CONTRACTOR.THIS INCLUDES EXCAVATIONS,COLUMNS,EQUIPMENT G. INCLINATION AND POSITION OF PILES,TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, EW EACH WAY UPA UNDER POST ABOVE accordanceac mwith Sectionti 70speewm mnspectans m - -
<br /> --
<br /> LOADS,MATERIAL LOADS,AND OTHERS.OBSERVATIONS BY THE ENGINEER-OF-RECORD DO NOT TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED FB FLUSH BEAM UWA UNDER WALL ABOVE 7 For specially elements pedorm addn0na1 inspection
<br /> BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. as determined by the regstered design professional In - -
<br /> INCLUDE INSPECTIONS OF TEMPORARY LOADING AND STABILITY DURING CONSTRUCTION. FIN FINISH VERT VERTICAL responsible name
<br /> 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION,MISALIGNMENT,OR FAILURE TO MEET OTHER
<br /> 16. MINIMUM ASSUMED SOIL BEARING CAPACITY. 1,500 PSF FL FLOOR VIF VERIFY IN FIELD
<br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE.ABANDON REJECTED PILES AND
<br /> FLSHG FLASHING W/ WITH 3928 FRIDAY AVE SE
<br /> INSTALL ADDITIONAL PILES AS REQUIRED. END FOUNDATION WC WESTERN CEDAR EVERETT
<br /> FP FIREPLACE WP WATERPROOF
<br /> HELICAL PILE PROOF TESTING FT FOOT WWF WELDED WIRE FABRIC WA 98201
<br /> THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3)
<br /> CONCRETE ANCHORS PERCENT OF PILES UP TO FIVE(5)PILES MAXIMUM(ONE(1)MINIMUM)IN ACCORDANCE WITH THE PROCEDURE
<br /> 1. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG TIE,HILT!,OR EQUIVALENT.SPECIAL OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE(IBC).THE MAXIMUM TEST LOAD S240104-1 XR
<br /> INSPECTIONS REQUIRED. SHALL BE TWO-HUNDRED(200)PERCENT OF THE SPECIFIED DESIGN LOAD.
<br /> JT
<br /> STRUCTURAL AND MISC.STEEL PROOF TESTING SHALL BE IN ACCORDANCE WITH ASTM STANDARD D 1143-81.GEOTECHNICAL SPECIAL
<br /> 1. REFERENCE STANDARDS:DESIGN,FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE INSPECTOR SHALL BE CONTINUOUSLY PRESENT DURING PILE INSTALLATION AND LOAD TESTING.PROOF M RT
<br /> LATEST EDITION OF THE AISC"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". TESTING SHALL BE APPLIED TO EACH OF THE LOAD CONFIGURATIONS SPECIFIED IN THE PILE SPACING 8 LOAD
<br /> 2. MATERIALS: REQUIREMENTS TABLE.MINIMUM ONE(1)PILE PER LOAD CONFIGURATION SHALL BE TESTED. 03/04/2024
<br /> BOLTS-ASTM A307,UNLESS OTHERWISE NOTED
<br /> WF BEAMS-ASTM A572-50(Fy=50,000 PSI)
<br /> ASS ROUND COLUMNS-ASTM A500 Gr.B(Fy=42,000 PSI)
<br /> HSS RECTANGULAR COLUMNS-ASTM A500 Gr.B(Fy=46,000 PSI)
<br /> ALL OTHER STEEL-ASTM A36(Fy=36,000 PSI)
<br /> STRUCTURAL STEEL WELDING
<br /> 1. CONFORM TO THE AWS CODES D1.1 AND D1.3.,AND USE ONLY CERTIFIED WELDERS.WELDS NOT
<br /> SPECIFIED ARE TO BE 1/4"CONTINUOUS FILLET MINIMUM.USE DRY E70 ELECTRODES.
<br /> ALTERNATES:
<br /> 1. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW.ENGINEER MAY REQUEST In
<br /> W
<br /> PAYMENT FOR REVIEW;CONTRACTOR WILL BEAR BURDEN FOR ADDITIONAL PAYMENT AT NO ADDITIONAL H
<br /> COST TO OWNER.
<br /> Z
<br /> IOBSITE SAFETY:
<br /> 1. THE ENGINEER AND/OR ARCHITECT HAVE NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN cc
<br /> Q
<br /> AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR H
<br /> TO MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM U
<br /> HIS WORK.THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER AND/OR ARCHITECT SHALL U
<br /> NOT BE CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR cc
<br /> (-
<br /> PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR,SUBCONTRACTORS, L/)
<br /> SUPPLIERS OR THEIR EMPLOYEES,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL OR OCCUPANCY BY ANY Q ,-t