|
(E)WOOD FRAMED K :F
<br /> FLOOR SYSTEM, "" r
<br /> FIELD VERIFY •
<br /> i ...
<br /> 1,
<br /> (E)CONC STEM WALLL=
<br /> TRUFORCE UNDERPINNING BRACKET FOR 2 7/8"PILE SHAFT " „ ,moo„� ro
<br /> : a,..wa,...., 2 7/8"O.D.X 0.203"WI HELICAL LEADS&EXTENSIONS
<br /> I rt u'°"�
<br /> --—r ICC-ES AC358-REPORT#ESR-3750
<br /> T/STEM WAL4 N NAy
<br /> FIELD VERIFY :�
<br /> 8"MIN THICKNESS, I ; T/FIN GRADE= I n
<br /> CONTRACTOR TO VERIFY _, 1
<br /> r` N a, '
<br /> VARIES 1 F
<br /> ii
<br /> i CK (E)FTG TO BE CUT FLUSH 4 I II
<br /> _1!11 (`" R
<br /> w ti WITH FACE OF STEM WALL j u re - Ib" 1 ra _u—
<br /> w WITH A 12"MAX WIDTH FOR 1 f- n W
<br /> o INSTALLATION POCKET — —r — ^r" { I I u�r" 'I YryN r I r s —�I_ Q j
<br /> O H - di
<br /> -L can".u.s ✓rt.)
<br /> -II 11 ~ W
<br /> IV V " fIII
<br /> {i % P_ ,tno Z tJ
<br /> T/CONC FTG= a- �°� _ I- W
<br /> HELD VERIFY m•.0 ,� ".»OM. b b u R m ,,,,„ , z
<br /> ° IT L' Z W z�.
<br /> re �„�Io : ,'
<br /> _ �.R .�TO.„so„S „"� J
<br /> nwE..n
<br /> lo,-renowE+Ews>awas _
<br /> (E)CONTINUOUS IDEAL HELICAL PILE&REPAIR ".R� "emu KmR "_„ °" r ' M " ,", ss �;, w
<br /> ";rxr,,,cuY..®,wrom"oo.,,s+„.,v,�o.�m 117CdL MEI�,,.� , �I17Cd�.
<br /> CONC FOOTING BRACKET ASSEMBLY PER S. , M; .m , ,, MSTEUSED..,m� "° Via.?""°
<br /> NOTES: R&R FOUNDATION SPECIALIST ,v ,e`"'°"E"`T'VO.�.i1°0°O'"M„".a ` .:R� Group ••� " " """"'"`"'a'"'""'""�+m'�� ` w Group _
<br /> 1 CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION •
<br /> ' a"a`E"""s`"""""�"SYSTEM worms _ __ - `°`'`PEMO"."50 1®"".OQ�"`0A 1i""
<br /> TO CONFORM TO ESR-3750 I° I T »,A M .Ner; " @ I" ITili
<br /> DIMENSIONS OR PRIOR T INSTAONIF ENGINEER-OF-RECORDUMNOTINSTALLATION MET.
<br /> 2.ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION DOUBLE HELIX W/3 PITCH ��
<br /> RESISTANT SYSTEM.THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED
<br /> HOLES.CORROSION PREVENTION COATING SYSTEM BY OTHERS.PRIME AND
<br /> PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123.
<br /> 3.AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT
<br /> SHALL BE SEALED OR COATED TO PREVENT CORROSION.
<br /> 4.REFER TO GENERAL NOTES FOR GEOTECHNICAL PILE EMBEDMENT
<br /> REQUIREMENTS.NOTE THAT THESE SHALL BE ACHIEVED PRIOR TO THE
<br /> APPLICATION OF THE REFUSAL CRITERIA
<br /> 5.REFER TO GENERAL NOTES FOR PILE FIELD TESTING REQUIREMENTS.
<br /> 1 HELICAL PILE INSTALLATION DETAIL 2 HELICAL PILE INSTALLATION DETAIL 3 HELICAL PILE INSTALLATION DETAIL
<br /> (E)WOOD FRAMED
<br /> FLOOR SYSTEM,
<br /> FIELD VERIFY
<br /> ir_
<br /> 3928 FRIDAY AVE SE
<br /> (E)CMU STEM WALL EVERETT
<br /> 4i
<br /> \ T/STEM WALL=d, STEEL ANGLE INSTALLATION AT(E)CMU STEM WALL: WA 98201
<br /> FIELD VERIFY
<br /> 8"(NOMINAL)MIN THICKNESS. S -} TIFIN GRADE= S240104-1XR
<br /> CONTRACTOR TO VERIFY VARIES
<br /> JT
<br /> 1
<br /> w 16 LL - 'i - (E)FTG TO BE CUT FLUSH '_�_______� 7� MRT
<br /> z qQ> WITH FACE OF STEM WALL 03/04/2024
<br /> EEV 0 1- 1111111 —PMEZIEE®-11111111 —111
<br /> N •
<br /> T/GONG FTG= CONC FTG , ,
<br /> -_. FIELD VERIFYv.
<br /> W 1
<br /> 4.5"MIN - ANGLE IRON&ANCHORAGE I ..� - z w
<br /> WHERE REQ'D PER PLAN m ANCHOR SPACING,
<br /> \ - - _ z .5=12"OC MAX UNO
<br /> •. /
<br /> IDJEALHELALPLE&REP AIR SUPPLEMENTAL ANGLE
<br /> (E)CONTINUOUS BRACKET ASSEMBLY PER R&R L6x6x3la xa'-0"
<br /> CONC FOOTING CENTER ON PILE
<br /> NOTES' FOUNDATION SPECIALIST TO
<br /> -
<br /> 1.CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION CONFORM TO ESR-3750 2-7/8" PILE AND CONNECTIONS PER
<br /> DIMENSIONS PRIOR TO INSTALLATION.ENGINEER-OF-RECORD TO BE SHAFT W/10"DIAM DOUBLE R&R FOUNDATION SPECIALISTS,TYP
<br /> NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. HELIX W/3 PITCH
<br /> 2.ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION Ln
<br /> RESISTANT SYSTEM.THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED �J-.
<br /> HOLES.CORROSION PREVENTION COATING SYSTEM BY OTHERS.PRIME AND Q
<br /> PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. I-
<br /> 3.AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT NOTES: ABSSer"mxs: LLJ
<br /> ON-.CO N CEE
<br /> SHALL BE SEALED OR COATED TO PREVENT CORROSION. 1)ALL STEEL MEMBERS AND COMPONENTS SHALL BE GALVANIZED FOR EXTERIOR USE. C R,ewRRE MASONRY MT
<br /> TE
<br /> 4.REFER TO GENERAL NOTES FOR GEOTECHNICAL PILE EMBEDMENT Crnn•CENTERED
<br /> REQUIREMENTS.NOTE THAT THESE SHALL BE ACHIEVED PRIOR TO THE 2)ALL ANCHORS SHALL BE 5/6"0 B SIMPSON TITEN HD SCREW ANCHORS W/4"MINIMUM EMBEDMENT INTO.F EACH RG Z
<br /> APPLICATION OF THE REFUSAL CRITERIA CONCRETE.ANY SUBSTITUTION SHALL BE SUBMITTED TO L120 FOR APPROVAL PRIOR TO INSTALLATION. .,"�, ,"w 0
<br /> 5.REFER TO GENERAL NOTES FOR PILE FIELD TESTING REQUIREMENTS. 3)ANCHORS SHALL BE INSTALLED WITHIN 6"OR LESS FROM EACH END OF STEEL MEMBER. a_c»Cflef, "•"I
<br /> 4)ADDITIONAL REQUIREMENTS PER ANCHOR MANUFACTURER. u„0-"nESSr.0re00T"F" S Q o
<br /> o in
<br /> Z
<br /> 4 HELICAL PILE INSTALLATION DETAIL 5 HELICAL PILE INSTALLATION DETAIL 6 0
<br /> LL
<br />
|