My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Casne Engineering, Inc. 9/24/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Casne Engineering, Inc. 9/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:29:54 PM
Creation date
9/25/2024 12:29:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Casne Engineering, Inc.
Approval Date
9/24/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Electrical Engineering Design and Construction Services for the Lift Station 47 - Beverly Lake Sanit
Tracking Number
0004529
Total Compensation
$31,442.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3545 Factoria Blvd SE, Suite 200 <br />Bellevue, WA 98006 <br />(425) 522-1000 <br />P241138-001R1 City of Everett Beverly Lake Sewage Lift Station Proposal Ltr 2024_0731.docx <br />Bellevue, WA w Carlsbad, CA w Spokane, WA <br />July 26, 2024 <br />City of Everett Public Works Department <br />Everett WA, 98201 <br />Attention: Dan Enrico <br />Project Engineer <br />Subject: Beverly Lake Sanitary Sewer Replacement & LS #47 <br />Electrical Engineering Design and Construction Services <br />Casne Proposal P241138-001R1 <br />Dear Mr. Enrico, <br />Thank you for the opportunity to provide this proposal to complete this design and support <br />construction for this project. <br />Background <br />The sewage piping in this area was identified as in need of replacement over ten years ago. <br />The new design, which is near complete, was brought to its current state by City of Everett <br />engineers, and possibly other partners we are not aware of, some time ago. The electrical <br />portion of the design pertains only to the sewage lift station area, which includes a duplex <br />pump wet well, PLC control panel, 480V VFD control panel, standby generator, electrical <br />equipment rack, and other electrical equipment, all underneath a canopy and surrounded by a <br />security fence. <br />Electrical service to this system will be completed by Snohomish PUD, including pole mounted <br />transformer (existing to be replaced at their discretion) and pad mounted lift station <br />transformer. <br />Project Approach <br />The existing electrical design will be reviewed, updated and stamped. The current design <br />package contains seven electrical sheets, as well as electrical specification sections. We will <br />review and update the design to meet NEC and local code requirements, and implement updates <br />to ensure a complete and practical electrical installation. <br />We will support the City of Everett during the bid phase, including an onsite bid meeting with <br />prospective bidders and answering electrical related bid questions from bidders. <br />Construction phase service will include electrical product submittal reviews and RFI response, <br />supporting coordination between Snohomish PUD and electrical contractor, assisting with <br />commissioning planning, onsite commissioning support with owner and the integration team <br />(City of Everett performing programming internally). Upon construction completion, we will assist
The URL can be used to link to this page
Your browser does not support the video tag.