My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Casne Engineering, Inc. 9/24/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Casne Engineering, Inc. 9/24/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:29:54 PM
Creation date
9/25/2024 12:29:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Casne Engineering, Inc.
Approval Date
9/24/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Electrical Engineering Design and Construction Services for the Lift Station 47 - Beverly Lake Sanit
Tracking Number
0004529
Total Compensation
$31,442.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Dan Enrico <br />7/26/24 <br />Page 3 of 3 <br />Bellevue, WA w Carlsbad, CA w Spokane, WA <br />Compensation <br />Casne Engineering proposes to perform the Scope of Services outlined above on a Time and <br />Materials basis in accordance with the attached Fee Estimate worksheets. The cost breakdown <br />is as follows: <br />Design $ 7,502 <br />Construction Assistance $ 23,940 <br />TOTAL $31,442 <br />As requested, I have broken this cost down by tasks discussed in our meeting on 7/25: <br />Thank you again for this opportunity. If you have any questions or additional information is <br />required, please do not hesitate to call. <br />Sincerely, <br />CASNE ENGINEERING, INC. <br />Travis Kinder <br />Project Manager <br />Attachments <br />cc: Paul Wilhelm, City of Everett <br />Curtis Clute, Casne <br />File <br />Design Review:$3,336 <br />Design Completion:$4,166 <br />Bid Phase:$1,600 <br />Construction Support: $9,440 <br />Commissioning Support: $9,380 <br />Arc Flash:$3,520 <br />Total $31,442
The URL can be used to link to this page
Your browser does not support the video tag.