My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE 2024-10-14
>
Address Records
>
12TH DR SE
>
6200
>
6200 12TH DR SE 2024-10-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:13:44 PM
Creation date
9/30/2024 11:16:47 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan Page 9 <br /> D. Cx Process and Sequence <br /> 1. The following is an overview of the Cx process and defines the project phases in <br /> the terms used in this plan. <br /> Project Phase & Description Cx Sequence <br /> a) Construction Phase • CA submits Cx Plan. <br /> Phase of the project during which the • CA develops detailed equipment-specific <br /> facility is constructed and/or systems and checklist and Functional Performance Test <br /> equipment are installed and started. procedures and documentation. <br /> Contractor and subcontractors execute . CA, A/E, and contractors review FPTs. A/E <br /> installation start-up forms, and submit approves FPTs. <br /> O&M, and warranty information. e Contractors submit Training Plans for A/E <br /> Contractor/Vendors conduct equipment approval. <br /> specific training. • Contractors conduct installation inspections. <br /> Construction phase will conclude after CA reviews reports and attends periodic <br /> successful system and equipment progress meetings. <br /> startups. e Contractor executes and documents the <br /> start-up and checkout. CA invited to witness. <br /> Documentation is gathered throughout <br /> testing phases <br /> b) Construction Acceptance Phase: • CA directs/conducts Functional Performance <br /> The facility systems and equipment are Tests in which most parties are also <br /> inspected, tested, verified, etc. and is participants to some degree. <br /> when most of the formal training occurs. . CA documents testing and compiles <br /> This will occur after the construction phase information for A/E approval. <br /> is complete. A/E and contractor finalize e Contractors submit updated training plans <br /> "as built" or record documentation. and systems level training programs for A/E <br /> Approved Functional completion marks the approval. CA reviews. <br /> end of this phase. • Contractor updates and submits record <br /> drawings and specs. <br /> • CA, A/E, and Owner review and approve <br /> systems O&M manuals. <br /> c) Occupancy & Operation Phase: • CA verifies that systems meet the OPR and <br /> The process begins to close out the BOD. <br /> project, to meet any future ongoing • GC sets up final training classes and <br /> training, contractor callbacks. workshops. <br /> Final acceptance and documentation will e CA updates the Cx plan to reflect the final <br /> be approved by the Owner. design. <br /> • CA will submit Cx final report for A/E <br /> approval. <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 9 of 68 Everett, WA <br />