My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE 2024-10-14
>
Address Records
>
12TH DR SE
>
6200
>
6200 12TH DR SE 2024-10-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:13:44 PM
Creation date
9/30/2024 11:16:47 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan Page 29 <br /> c) Be maintained in good repair and operating condition throughout the <br /> duration of use on this project. <br /> d) Be recalibrated/repaired if dropped or damaged in any way since last <br /> calibrated. <br /> E. Meetings <br /> 1. Kickoff Commissioning Meeting: The CA will schedule and lead a commissioning <br /> kickoff meeting with the entire commissioning team in attendance. The CA will <br /> distribute the meeting agenda to all parties prior to the meeting. Information <br /> gathered from this meeting will allow the CA to update the commissioning plan, <br /> PFPTs, and FPTs. <br /> 2. Progress Commissioning Meetings: The CA will schedule and lead progress <br /> meetings as deemed necessary by the CA as construction progresses during the <br /> commissioning phase. These meetings will cover coordination, deficiency <br /> resolution and planning issues with Cx team members. The GC shall assure <br /> attendance of the appropriate subcontractors at the meetings. <br /> 3. Plan and coordinate meetings as required to monitor construction and <br /> commissioning progress the work. Notify the Owner of construction job-site <br /> meetings to address coordination, deficiency resolution and planning issues. All <br /> commissioning team members are required to attend progress meetings, unless <br /> exception is specifically provided by the CA. <br /> 4. The commissioning team shall schedule activities to expedite the testing process <br /> and minimize unnecessary delays, while not compromising the integrity of the <br /> procedures. Successful commissioning requires cooperation of the General <br /> Contractor, Contractors, vendors, Architect, Engineers, Commissioning Authority, <br /> Owner, and building manager. <br /> V. CX SCHEDULE <br /> A. Commissioning Milestone Schedule <br /> 1. The commissioning schedule summarizes the commissioning activities to be <br /> performed on the project. See attached Cx Schedule for details. <br /> B. Cx Schedule Coordination <br /> 1. General Contractor will provide the CA with a complete construction schedule. <br /> Upon receipt of construction schedule, the CA will provide the General <br /> Contractor and Owner with a complete commissioning schedule. <br /> 2. CA will coordinate with the General Contractor and subcontractors to integrate <br /> Cx activities into the overall construction schedule. The Cx schedule will be <br /> updated and submitted as information changes during the project. <br /> 3. Detailed integration of Cx activities and tasks into the construction schedule is <br /> critical to maintaining project milestones. Cx activities will be scheduled with the <br /> General Contractor prior to respective construction phase activities. <br /> 4. Cx activities will be coordinated to occur while required subcontractors' <br /> Verification and Testing personnel are on-site and available, per General <br /> Contractor's construction schedule. <br /> 5. Coordinated schedule will include milestone activities for each significant project <br /> event through construction to building systems commissioning completion. <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 29 of 68 Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.