Laserfiche WebLink
18.28.210 <br /> when buildings are protected by an approved automatic approved by the city engineer and shown on an <br /> fire sprinkler system. approved grading plan. <br /> D. Each building site on each lot in a multiple-fam- F. On projects that have environmentally sensitive <br /> ily or commercial subdivision or short subdivision shall features and in critical drainage areas,clearing and grad- <br /> be no further than two hundred driving feet from a fire ing and other significant earth work may be limited to a <br /> hydrant and not closer than fifty feet from building site. specific time period as determined by the city. <br /> E. For all divisions of land,this title shall control in G. All projects must be in compliance with the <br /> the event of a conflict with any other city regulations. approved grading plan prior to final approval being <br /> (Ord.2328-98§7(F)(14),1998) granted.The director or city engineer may require a final <br /> as-built topography map to show compliance with the <br /> 18.28.200 Clearing and grading. approved grading plan and to calculate building height <br /> A. Before any site modification where existing nat- as required by the Everett zoning code.(Ord.2718-03 <br /> ural features would be disturbed or removed,a grading §33,2003;Ord.2328-98§7(F)(15),1998) <br /> plan meeting city standards and the provisions of this <br /> title must be submitted and approved by the city engi- 18.28.210 . Lot requirements. <br /> neer showing the extent of the proposed modification. A. Lot arrangement and design shall take into con- <br /> B. Debris and waste such as trees, timber,rocks, sideration,to the maximum extent possible,the natural <br /> stones,junk, rubbish,or other waste materials of any features of the site such as environmentally sensitive ` <br /> kind shall not be buried in any land or deposited in any areas,parks,open space,and views.Each lot shall pro- <br /> environmentally sensitive area. vide a suitable building site and driveway access from <br /> C. All erosion control plans must be in compliance existing or proposed streets.Refer to Section 18.28.130 <br /> with city standards and the city's drainage ordinance. for specific lot requirements for easement access lots. <br /> D. In critical drainage areas or on sites that are clas- B. Double frontage lots shall be avoided whenever ` <br /> sifted as environmentally sensitive, the city may pro- possible. <br /> hibit clearing of lots until building permits have been C. Lots shall not,in general, access off of arterial <br /> issued. streets. Where driveway access from a street may be <br /> E. All clearing and grading shall be based on sound necessary for several adjoining lots,the city may require <br /> engineering techniques and meet the following mini- that such lots be served by combined access points and <br /> mum standards: driveways designed or arranged so as to avoid requiring <br /> a 1. The project design and grading shall follow v 'cies to back into traffic. <br /> ' good engineering practices. Consideration shall be D. All lots that have full frontage on an improved <br /> given to protection of slope stability,prevention of ero- public right-of-way shall have the dwelling oriented to <br /> sion, structural suitability for future buildingsites, the public street.The dwelling shall have a defined front <br /> driveways,and public streets; entrance,windows and porch facing the street. <br /> 2. Building sites, driveways, and public streets E. Calculation of Lot Area. The computations for <br /> shall not be located on fill unless approved by the city meeting minimum lot area requirements for the Everett <br /> based on information provided to the city by the appli- zoning code must exclude the following:drainage tracts <br /> cant in a geotechnical report prepared by a Washington or above-ground drainage improvements, panhandles <br /> State licensed geotechnical engineer; and common recreation facilities,except as permitted <br /> 3. Grading shall be done in such a manner as to by the cluster alternative for subdividing.Also refer to <br /> minimize the need for rockeries and retaining walls Sections 18.28.130 and 19.39.130. <br /> along lot lines,streets and the exterior boundaries of the F. Through the cluster subdivision or cluster short <br /> project; subdivision process,the director may modify the Ever- <br /> 4. Clearing and grading limits shall be established ett zoning code requirements for individual lots for <br /> so as to not impact environmentally sensitive areas,the width, depth, area, frontage, and setbacks; provided, <br /> required buffers,and adjacent properties; that Everett zoning code density standards are met for <br /> 5. Each lot shall have a suitable building site and the total site subject to the cluster subdivision or short <br /> driveway access.All grading should gradually transition subdivision process. <br /> to the approved grading limit and the projects exterior G. Irregular shaped lots shall be discouraged. In <br /> boundaries;and general, all lots shall be composed of straight lines <br /> 6. • Excavation of foundation material, utility •which provide adequate building site and private rear <br /> trenches,and required public improvements shall not be yard area,except as permitted in cluster subdivisions or <br /> distributed within the project boundaries and must be short subdivisions and binding site plans. <br /> disposed of at a preapproved site, unless otherwise H. Individual lots in a binding site plan are not <br /> required to provide landscaping on each lot to Everett <br /> D. 51a,:+.(k n o+ . r,i f 10 Or1itE <br /> 675 5 - (Everett 12-04) <br /> ie.. ! <br /> K-17 t <br />