Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> MEMORANDUM <br /> TO: Carmel Gregory I CG Engineering, 425-778-8500 <br /> CC: Jared Underbrink I CG Engineering, 425-778-8500 <br /> FROM: Thad Newport I City of Everett Engineering/Permit Services,425-257-8814 <br /> DATE: 06/07/2019 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Construct new storage and garage building and site improvements <br /> LOCATION: 2328 10311 ST SW <br /> PERMIT#: PWW1811-001 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following revisions <br /> should be made and/or the following conditions must be met: <br /> Please see the compiled list of comments below and the attached redlines to revise your plans accordingly, <br /> prior to resubmitting to the Permit Services Counter. If you have any questions regarding the <br /> comments/redlines or need anything further, please directly contact this project's Public Works plans <br /> reviewer,Thad Newport, at TNewport@everettwa.gov (or 425-257-8814), or the other reviewers listed <br /> depending on the scope of the question. Please note that these comments are compiled from Public Works <br /> reviewers for the Public Works (civil) plans only. The applicant team may receive a separate comment letter <br /> from the Building Reviewer and/or the Planning Reviewer for architectural, landscape, or other types of <br /> drawings. <br /> 1. Please resubmit the following items to the Permit Services Counter with your resubmittal once all <br /> requested revisions have been made: <br /> a. Transmittal Sheet: (1) available at the Permit Counter (and included herein for your use upon <br /> resubmittal). <br /> b. Plans: (2)full size sets of revised plans, plus original City Markups. <br /> c. Operations and Maintenance Manual: (1) copy. <br /> d. SWPPP Report: (1) copy. <br /> e. Revised Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form filled out <br /> for the City to use to calculate the Public Works Permit Fee (as applicable based on water plan <br /> revision). <br /> The Permit Counter is open Monday through Friday from 7:30am-12:00pm and from 1:00pm-4:00pm (closed <br /> between 12:00pm-1:00pm for lunch). <br /> 2. Please see all redlines on the attached plans for required corrections in addition to all comments listed <br /> below. Frequently, redlines will be stand-alone and will not have an associated item in this corrections <br /> Page 1 of 2 <br />