Laserfiche WebLink
PUBLIC WORKS <br /> which has not been provided for the pipe shown for the frontage improvements. <br /> 3. The comments below were generated from this project's Planning Reviewer. If you have any <br /> questions regarding these comments,please contact Dave Tyler with the City of Everett Planning <br /> Department(425-257-7164 or DTyler(u)everettwa.gov). <br /> a. Sheet A.1.0 — Architectural site plan. Show all setbacks to property lines, critical area <br /> boundaries, in addition to building dimensions. <br /> b. Critical Area restoration improvements. After performing a field visit this week it appears <br /> that all restoration work is complete,with the exception of the permanent fence along the <br /> edge of the buffer. The fence must be installed prior to issuance of occupancy permits, or <br /> a performance bond will be required at the time of final inspection. This will be noted on <br /> the plans. <br /> c. Critical Area maintenance/monitoring assurance device—Prior to issuance of construction <br /> permits, please provide a maintenance assurance device consistent with the approved <br /> restoration plan (see attached forms). You can use either the cash deposit or set-aside <br /> letter method. <br /> Page 3 of 3 <br />