My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1831 100TH ST SW B 2024-11-12
>
Address Records
>
100TH ST SW
>
1831
>
1831 100TH ST SW B 2024-11-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 2:32:54 PM
Creation date
10/3/2024 10:46:06 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1831
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113TIL 19011 Wood-Sno Road NE,Suite 100 <br /> Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> ENGINEERING Fax:(425)821-2120 <br /> SPECIAL INSPECTION <br /> Date: May 3,2024 <br /> To: Pacific Ridge Homes <br /> Attn: Ezra Schrader <br /> From: Aiden Bernhardt,P.E. <br /> Project: Benton Square TH—Building E Pages: 2 <br /> BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br /> nailing at 4"on center or less for the abovementioned project. The following Special Inspection Report includes a <br /> summary of our site visit. <br /> Construction Documents: <br /> ❑ Construction Set dated 01/09/2024 <br /> Progress of construction: <br /> ❑ Date of inspection:04/24/2024 <br /> ❑ Foundation completed <br /> ❑ Framing completed <br /> Items observed: <br /> 31d Floor Exterior Walls: <br /> ❑ Front/Rear P1-4 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> Note: (4)instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br /> were observed at time of inspection.Builder has been notified and has provided pictures of <br /> the resolution.Construction conforms to plan set. <br /> o Panel Seam Construction.Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> 2nd Floor Exterior Walls: <br /> ❑ Front/Rear P1-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices: <br /> Note: (4)instances of the parry wall end nailing not tying into the exterior wall per detail 8/S06 <br /> were observed at time of inspection.Builder has been notified and has provided pictures of <br /> the resolution.Construction conforms to plan set. <br /> o Panel Seam Construction: <br /> Note: (3)instances of P1-2 wall missing double studs at the adjoining panel edges per Detail 1/S06 <br /> were observed at time of inspection.Builder has been notified and has provided pictures of <br /> the resolution.Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> 15t Floor Exterior Walls: <br /> ❑ Front P2-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction Conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans:Construction Conforms to plan set. <br /> o Panel Seam Construction.Construction conforms to plan set. <br />
The URL can be used to link to this page
Your browser does not support the video tag.