Laserfiche WebLink
May 3, 2024 <br /> o Anchor bolt spacing. <br /> Note: (1)instance of an anchor bolt being misaligned with the mudsill within a wall was observed <br /> at time of inspection.Builder has been notified and has provided pictures of additional <br /> anchorage and a resolution for the off-center plate washer.Construction conforms to plan <br /> set. <br /> ❑ Rear P1-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> o Panel Seam Construction.Construction conforms to plan set. <br /> o Anchor bolt spacing: Construction conforms to plan set. <br /> Give me a call if you have any questions or comments. <br /> Sincerely, <br /> Aiden Bernhardt,P.E. <br /> T.BTL Engineering <br /> �gST90 <br /> �SSIOIYAL <br /> 9 Page 2 <br />