Laserfiche WebLink
NORTH <br /> U INSTALL 24 LF OF ju verizonv' <br /> Ic c m wvs below. <br /> 1 -2" HDPE CONDUIT fall before you dig. <br /> (TRENCH) PROJEc oNDMaEB PROJECT: <br /> (RESTORE TRENCH TO LEGEND: 1801AVAO.3 ROW EVT 0637 <br /> R p ALL APPLICABLE STANDARDS) BORE/MISSILE BORE 1ERM-1-ENT,TY <br /> INSTALL 6 LF OF — — — OPEN TRENCH CITY OFEVERETT <br /> SIDEWALK FB�E�ZAT <br /> 1 -2" HDPE CONDUIT E.O.P EVERTT, <br /> EDGE OF PAVEMENT ETT,WLCREEKPKWY <br /> VE WA <br /> (TRENCH) B.O.c BACK OF CURB <br /> e p C. \ (RESTORE TRENCH TO R p W R.O.W. RIGHT OF WAY <br /> ALL APPLICABLE STANDARDS) C.L.--- STREET CENTERLINE <br /> im <br /> r • POTHOLE LOCATION O ZLU <br /> _ <br /> CV ce 7+00 Lu U Uj � <br /> ,rTQ J <br /> ✓V_ B C. <br /> 0' 10' 20' 40' O w <br /> �V <br /> C t. SST �+� Z z c� Lz <br /> o N ° o <br /> 0 <br /> INSTALL 78 LF OF U g ¢ w Z <br /> c? _ 1 -2" HDPE CONDUIT Q w w o <br /> �Q (BORE) <br /> J <br /> w <br /> C.L. w o <br /> STA: 7+23 a ., <br /> GAS DIG (1) 3'x 3' BOREPIT <br /> t1'J, <br /> CONTRACTOR TO REPAIR <br /> \GAS _ ALL AFFECTED SIDEWALK FORESITE <br /> B.O.C. \ PANELS IN ACCORDANCE WITH / A gPOUn <br /> F...Group,Inc. w I wnw.fg-Inc net <br /> /Q ALL APPLICABLE STANDARDS S 3DOD EC—Ch..St. u1334.887.6064 <br /> O / C^ Suite 400 f 334.887.6024 <br /> tv�'Y / Austin,TX]8]02 <br /> JJ, INSTALL 10 LF OF — G <br /> RE 1 - 2" HDPE CONDUIT AGE TA <br /> T ES- <br /> (BORE) / y <br /> STA: 6+39 <br /> BOREPIT/ INSTALL (1) CONTRACTOR TO REPAIR <br /> / 36"x 60"x 36"VAULT ALL AFFECTED SIDEWALK <br /> PANELS IN ACCORDANCE WITH <br /> ALL APPLICABLE STANDARDS <br /> I STA: 6+44 ENGINEER: AB <br /> DRAWN <br /> DIG (1) 3'x 3' BOREPIT \ E NL <br /> REVISIONS <br /> DATE DESCRIPTION INITIAL <br /> NOTE TO CONTRACTOR: <br /> C� ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREE 04/02/19 REVISION 1.0 AB <br /> TO BE DUGGED USING HYDRO VACCUUM EXCAVATION. <br /> \ CAUTION!! <br /> (1 <br /> S \ ANY/ DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OF® \ ADC RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED IN <br /> ACCORDANCE WITH ALL REQUIRED ADA STANDARDS AND <br /> \ SPECIFICATIONS. <br /> S ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ON <br /> �g_�/ FIELD SURVEY AND OBSERVATIONS.LOCATIONS MAY NOT BE <br /> V ACCURATE OR COMPLETE. FXCFPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT <br /> n THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE <br /> V" CONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36 FIR PERTY of MCI COMMUNI IONS SERVICES,INC..BOT <br /> \ BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT B <br /> INCHES OF COVER WHEN UNOBSTRUCTED.CONTRACTOR TO REPRoouceO, coPIEO, OR useO FOR ANY PURPos <br /> MAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES. WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> DEPTH TO BE ADJUSTED ACCORDINGLY. <br /> \ UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON SCALE <br /> DOCUMENT RESEARCH AND FIELD EVALUATION. THE <br /> INFORMATION MAY NOT BE ACCURATE OR COMPLETE.IT IS HORIZONTAL: 1"=20' <br /> THE CONTRACTOR'S RESPONSABILITY TO PHYSICALLY <br /> \ J LOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES VERTICAL: N/A <br /> ,N WITHIN CONSTRUCTION PATH. <br /> ALL INSTALLATIONS MUST COMPLY WITH MINIMUM <br /> HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES. <br /> SHEET: C-04 <br />