Laserfiche WebLink
NORTH <br /> 1 0 /11� verizonv' <br /> Km <br /> R.O �w��ft PROJECT: <br /> •w INSTALL 7 LF OF STA: 9+33 PBo,E.ION MaEB <br /> 1 - 2" HDPE CONDUIT BOREPIT/ INSTALL (1) LEGEND: <br /> 1801AVA0.3 ROW EVT 0637 <br /> (TRENCH) <br /> 36"x 60"x 36"VAULT N BORE/MISSILE BORE <br /> — — — OPEN TRENCH CITY OFEVERETT <br /> \ (RESTORE TRENCH TO o R.O.W. SIDEWALK <br /> 8.O•C ALL APPLICABLE STANDARDS) ` E.O.P EDGE OF PAVEMENT 2215 MERRILL CREEK PKWY <br /> L EVERETT,WA <br /> 8+00 B.O.0 BACK OF CURB <br /> _ _9+00 - R.O.W. RIGHT OF WAY <br /> ,v _ B.O.C. C.L.--- STREET CENTERLINE 0- z <br /> • POTHOLE LOCATION <br /> p z <br /> ce S W— c Lu U) o <br /> C EX STORM —W o 10 20 ao 0 = a- Q <br /> —W <br /> �SS — — MAINTAIN 24" MIN Z z C� <br /> S _ CLEARANCE E o ♦/� o Z <br /> POTHOLE AND RESTORE _ � v♦ z > ° <br /> C.L. U Q w o <br /> INSTALL 84 LF OF TO STANDARDS — ` = SS — z a z <br /> 1 -2" HDPE CONDUIT — "u Y <br /> ro (BORE) 75TH ST SW E I E N of <br /> STA: 9+26 w ■; !:i o <br /> Q — ( STA: 8+18 UGE DIG (1) 3' x 3' BOREPIT I c/� a o .� <br /> UGE DIG (1) 3'x 3' BOREPIT _ GA <br /> w GAS CONTRACTOR TO REPAIR — n Lo <br /> _ <br /> z CONTRACTOR TO REPAIR Gas ALL AFFECTED SIDEWALK + <br /> J B'O C. ALL AFFECTED SIDEWALK PANELS IN ACCORDANCE WITH I OF) FORESITE <br /> v \ PANELS IN ACCORDANCE WITH ALL APPLICABLE STANDARDS I— e=IIeD,e Phe!� w wu3w 76 64 <br /> _ V� 3000 E Cesar CM1avez 5t. o 334.8888].064 <br /> • ls O]B]02 f 1 334.88].6024 <br /> Q �, � ALL APPLICABLE STANDARDS LiAUiin, <br /> < O•w cB INSTALL 21 LF OF z <br /> EX WATER R.O.W• <br /> MAINTAIN 24" MIN TREES 1 -2" HDPE CONDUIT <br /> CLEARANCE (BORE) <br /> POTHOLE AND RESTORE I Q <br /> TO STANDARDS <br /> INSTALL 108 LF OF <br /> 1 -2" HDPE CONDUIT <br /> (BORE) <br /> I ENGINEER: AB <br /> DRAWN BY: NIL <br /> REVISIONS <br /> I DATE DESCRIPTION INITIAL <br /> NOTE TO CONTRACTOR: 04/02/19 REVISION 1.0 AB <br /> ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREE <br /> TO BE DUGGED USING HYDRO VACCUUM EXCAVATION. <br /> CAUTION" <br /> ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OF <br /> ADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED IN <br /> ACCORDANCE WITH ALL REQUIRED ADA STANDARDS AND <br /> 1720 75TH STREET SOUTHWEST EVERETT SPECIFICATIONS. <br /> F <br /> L TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ON <br /> LD SURVEY AND OBSERVATIONS.LOCATIONS MAY NOT BE <br /> CURATE OR COMPLETE. <br /> EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT <br /> THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE <br /> CONTRACTOR TO PLACE UTILITY WITH A MINIMUM OF 36 PROPERTY OF MCI COMMUNICATIONS SERVICES,INC..BOT <br /> SING ISSUED IN BTRICT CONFIDENCE AND SHALL NOT B <br /> INCHES OF COVER WHEN UNOBSTRUCTED.CONTRACTOR TO REPRODUCED, COPIED, OR USED FOR ANY PURPOSE <br /> MAINTAIN 24 INCHES OF SEPARATION FROM OTHER UTILITIES. WITHOUT SPECIFIC WRITTEN PERMISSION. <br /> DEPTH TO BE ADJUSTED ACCORDINGLY. <br /> UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON SCALE <br /> DOCUMENT RESEARCH AND FIELD EVALUATION. THE <br /> INFORMATION MAY NOT BE ACCURATE OR COMPLETE.IT IS HORIZONTAL: 1"=20' <br /> I THE CONTRACTOR'S RESPONSABILITY TO PHYSICALLY <br /> LOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES VERTICAL: N/A <br /> WITHIN CONSTRUCTION PATH. <br /> ALL INSTALLATIONS MUST COMPLY WITH MINIMUM <br /> HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES. <br /> SHEET: C-05 <br />