Laserfiche WebLink
5 NORTH <br /> verizon,/ <br /> ts bd— <br /> J82S C Call be— PROJECT: <br /> AR/MFRRO LEGEND: 03MNTR.004 ROW EV 1333 <br /> BORE/MISSILE BORE <br /> ——— OPEN TRENCH CITY OF EVERETT <br /> ——— SIDEWALK <br /> E.O.P — EDGE OF PAVEMENT 1 397H STREET <br /> EVERETT,WA <br /> B.O.0 BACK OF CURB <br /> R.O.W.— RIGHT OF WAY > <br /> C.L.--- STREET CENTERLINE w <br /> • POTHOLE LOCATION Ov I - z U) <br /> V O = o <br /> v � d <br /> R.O.W. o' 10, 20' 40' O <br /> R.O.W. y0 0 _ <br /> Now <br /> £ r w <br /> 0 0 <br /> N ZO <br /> c� J ¢ = <br /> _ —�— Z a W <br /> N o � a <br /> S— — S— — —SS— — — S — — — — — — E.O.P N N � s <br /> E.O.P w o w <br /> V 0_ <br /> o _ LARIMER RD — _ — — C.L. a <br /> + C.L.- — — <br /> 0 <br /> M W E.O.P FORESITE <br /> < If — — —W— —W— — —W— ® SW W— — W gip <br /> L ~ 30+81 MHO H❑ MHO <br /> w MH❑ R.O.W. <br /> z <br /> � R.O.W. <br /> = INSTALL 10 LF OF <br /> v 1-2"HDPE CONDUIT <br /> (TRENCH) <br /> (RESTORE TRENCH TO <br /> ALL APPLICABLE STANDARDS) <br /> STA:30+71 <br /> BOREPIT/INSTALL(1) <br /> 36"X 60"x 36"VAULT ENGINEER: AB <br /> DRAWN BY: AS <br /> REVISIONS <br /> INSTALL 21 LF OF DATE DESCRIPTION INITIAL <br /> 1-2"HDPE CONDUIT NOTETOCONTRACTOR: <br /> ANY BOREPITS DUG NEXT TO DRIP NE OF AN EXISTING TREE <br /> (BORE) 7918 LARI MER RD TO BE DOGGED USING HYDRO VACCUUM EXCAVATION. <br /> CAUTIONII DISTURBANCEANY INFRASTRUCTURE <br /> OF <br /> ALA MP WILL REQUIRE ENT THE AMP TO BE I REPA RED IN <br /> ACCORDANCE WITH ALL REQUIRED ADA STANDARDS AND <br /> SPECIFICATIONS. <br /> ALL ELECOM UTILITY LOCATIONS ON PRINT ARE BASED ON <br /> FIELD SURVEY AND OBSERVATIONS.LOCATIONS MAY NOT BE <br /> OR COMPLETE. <br /> T"'T' TO PLACE UTILITY <br /> WITH <br /> A MINIMUM <br /> INCHES OF COVER WHEN UNOBSTRUCTED.CONTRACTOR TO xv wx <br /> MAINTAIN 2A INCHES OF SEPARATION FROM OTHER UTILITIES. ursaecnicraurrexrexuissiox. <br /> D PT, <br /> IUSTED <br /> UTUTYTLOCATIONS SHOWN ON THIS PLANARE BASED ON SCALE <br /> DOCUMENT RESEARCH AND FIELD EVALUATION. THE <br /> INFORMATION MAY NOT BE ACCURATE OR COMPLETE.IT IS HORIZONTAL: 1'=20' <br /> THE GO <br /> LIDGATE DDEPTHDF ALL urwTl VERTICAL: NIA <br /> WITHIN CONSTRUCTION- <br /> ALL ALL INSTALLATIONS MUST COMPLY WITH MINIMUM <br /> HORI-AND VERTICAL CLEARANCES FROM UTILITIES. <br /> SHEET:C-15 <br />