Laserfiche WebLink
MCI METRO GENERAL NOTES AND REQUIREMENTS verizon✓ <br /> PROJECT: <br /> 1703MNTR.004 ROW EVT 1333 <br /> GENERAL NOTES MCI OSP CONSTRUCTION GENERAL REQUIREMENTS CITY OF'EVERE T <br /> 2420 39TH STREET <br /> EVERETT,WA <br /> 1. MCI COMPRISES THE FOLLOWING OPERATING ENTITIES: • ALL FEDERAL,STATE AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWED WITHOUT EXCEPTION, <br /> MCI COMMUNICATIONS SERVICES,INC. > <br /> MCI METRO ACCESS TRANSMISSION SERVICES,LLC a <br /> • PERSONAL PROTECTIVE EQUIPMENT APPROPRIATE FOR THE SPECIFIC WORK SITE SHALL BE USED AT ALL TIMES. ¢ <br /> MCI METRO ACCESS TRANSMISSION SERVICES OF MASSAC INC. W <br /> ATA MINIMUM,HARD HAT,SAFETY SHOES/STEEL-TOED BOOTS,AND FLORESCENT ORANGE OR GREEN WORK VEST O Z <br /> MCI METRO ACCESS TRANSMISSION SERVICES OF MASSACHUSETTS,INC. V I <br /> ARE REQUIRED UPON ENTERING ANY MCI WORK SITE. O <br /> - METROPOLITAN FIBER SYSTEMS OF NEW VORK,INC. � = p <br /> v d <br /> 2. ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE APPLICABLE CODES OR REQUIREMENTS OF ANY REGULATING • USE OF INTOXICANTS,DRUGS,INHALANTS OR ANY OTHER SUBSTANCES THAT MAY IMPAIR ALERTNESS ARE STRICTLY j <br /> GOVERNMENTAL AGENCY,MCI METRO,OR THE RIGHT-OF-WAY GRANTOR. PROHIBITED. p W <br /> ZH 5 _ <br /> 3. LOCATIONS OF SOME OF THE PHYSICAL FEATURES WERE OBTAINED FROM DATED RAILROAD VALUATION MAPS OR OTHER • CONTRACTORS ARE NOT ALLOWED TO CUT ANY CABLE.CABLES SCHEDULED FOR REMOVAL WILL BE CUT BY MCI C� O OV <br /> DRAWINGS,AND MAY BE AS SHOWN OR DEPICTED ON THESE DRAWINGS. OPERATIONS PERSONNEL,AND ONLY AFTER VERIFICATION THAT ALL TRAFFIC HAS BEEN OFF-LOADED. C N r 11J zo <br /> cU N z Q o <br /> 4. UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS,BUT ARE NOT • EXTREME CAUTION MUST BE USED AT ALL TIMES WHEN WORKING ON OR NEAR ACTIVE CABLES.AN MCI EMPLOYEE C Z •�I a <br /> NECESSARILY EXACT.THEREFORE,UTILITY LOCATIONS WILL BE VERIFIED AT LEAST 100 FEET IN ADVANCE OF TRENCHING OR OR CONTRACT REPRESENTATIVE MUST APPROVE AND BE PRESENT PRIOR TO AND DURING ALL CABLE HANDLING Q w W a <br /> PLOWING,SO THAT CHANGES IN CABLE PLACEMENT CAN BE MADE IN EVENT OF CONFLICT. ACTIVITIES. F p C <br /> H � <br /> w • 7 <br /> 5. ALL KNOWN BURIED OBSTRUCTIONS ARE SHOWN ON SITE PLAN.ANY AND ALL OTHERS ENCOUNTERED ARE ALSO THE • TOOLS AND EQUIPMENT SPECIFICALLY DESIGNED FOR THE JOB AT HAND ARE REQUIRED.USE THE PROPER TOOL V O ELI 0 <br /> RESPONSIBILITY OF THE CONTRACTOR TO LOCATE,PROTECT,AND REPAIR,IF DAMAGED. FOR THE JOB. Q <br /> 6. ANY <br /> AND ALL IMPROVEMENTS,SUCH AS ASPHALT OR CONCRETE PAVEMENT,CURBS,GUTTERS,WALKS,DRAINAGE DITCHES, • CONDUIT WORK INVOLVING ACTIVE CABLES REQUIRES SPECIALIZED TOOLS SPECIFICALLY DESIGNED TO ACCESS <br /> EMBANKMENTS,SHRUBS,TREES,GRASS SOD,ETC.,IF DAMAGED,SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS. DUCTS WITH ACTIVE CABLES. <br /> • PROTECTING MCI FACILITIES IS EXTREMELY IMPORTANT;HOWEVER,SAFETY REGARDING YOURSELF AND OTHERS IS FORESITE <br /> T. EQUIPMENT TYPES SPECIFIED HEREIN(le:'BACKHOE""SWAMP PLOW".ETC.)ARE SUGGESTIONS ONLY AND ARE NOT INTENDED THE MOST IMPORTANT PART OF ANY PROJECT. group <br /> AS REQUIREMENTS.CONTRACTOR WILL BE NOTIFIED AS TO EXCEPTION& cn....s <br /> ENGINEER: AB <br /> DRAWN BY: AS <br /> REVISIONS <br /> DATE I DESCRIPTION INITIN_ <br /> SCALE <br /> HORIZONTAL: N/A <br /> VERTICAL: N/A <br /> SHEET:D-01 <br />