My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 10/10/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction 10/10/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 11:15:55 AM
Creation date
10/11/2024 11:15:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
10/10/2024
Council Approval Date
7/21/2023
End Date
12/27/2024
Department
Transportation Services
Department Project Manager
Brad Chenoweth
Subject / Project Title
Inductive Charging Infrastructure for Eclipse Mill Park
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003790
Total Compensation
$1,040,586.47
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 6/12/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
To: City Of Everett Department Transit COP #: 02 <br />3201 Smith Avenue Suite 215 Everett WA 98201 Date:6/28/2024 <br />Eclipse Mill Park Inductive Charging Infrastructure Attn:Brad Chenaweth <br />Project:23-06-ECL <br />Description: <br />supply and install aditional Plyslick per the owners request <br />Authored By: <br />Cost Breakdown: <br />Labor:Hours Rate Item Total <br />Project Manager 2 85.00$ 170.00$ <br />Labor 6 66.16$ 396.96$ <br />Material & Equipment:Qty. Cost Item Total <br />polyslick 20 33.40$ 668.00$ <br />- -$ -$ <br />- -$ -$ <br />Cost Summary:Amount: <br />Labor:566.96$ <br />Material & Equipment:668.00$ <br />Subtotal:1,234.96$ <br />Overhead:10.0%123.50$ <br />Profit:5%67.92$ <br />COP Total:1,426.38$ <br />Total does not include WA State Sales Tax <br />Work will not proceed until this COP is included in an executed change order updating the contract price. <br />This COP: 1,426.38$ <br />Other Pending COP's: <br />Total Pending COP's: 1,426.38$ <br />Reservation of Rights. This change order proposal is based solely on direct cost elements such as labor, material, and normal markups, and <br />does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead acceleration, and/or <br />impact costs which are not possible to assess at the present time. Right is expressly reserved to make claim for any and all of these <br />related items of compensable cost overrun prior to final settlement of this Contract. <br />Change Order Proposal <br />499 NE Midway Blvd. Ste. 2, Oak Harbor, WA 98277 <br />Phone: (360) 679-3000 Fax: (360) 679-2589
The URL can be used to link to this page
Your browser does not support the video tag.