My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 10/10/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction 10/10/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 11:15:55 AM
Creation date
10/11/2024 11:15:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
10/10/2024
Council Approval Date
7/21/2023
End Date
12/27/2024
Department
Transportation Services
Department Project Manager
Brad Chenoweth
Subject / Project Title
Inductive Charging Infrastructure for Eclipse Mill Park
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003790
Total Compensation
$1,040,586.47
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 6/12/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
To: City Of Everett Department Transit COP #: 04 <br />3201 Smith Avenue Suite 215 Everett WA 98201 Date:9/9/2024 <br />Eclipse Mill Park Inductive Charging Infrastructure Attn:Brad Chenoweth <br />Project:23-06-ECL <br />Description: <br />Authored By: Peter Uzunov <br />Cost Breakdown: <br />Labor:Hours Rate Item Total <br />Project Manager 4 85.00$ 340.00$ <br />Site Superintendent 5 75.00$ 375.00$ <br />Operator 9 88.26$ 794.34$ <br />Labor 9 63.62$ 572.58$ <br />Material & Equipment:Qty. Cost Item Total <br />ABS Pipe & Clamps 1 22.64$ 22.64$ <br />Concrete for caps 1 63.58$ 63.58$ <br />Washed Sand 5 yard fob job site 1 375.00$ 375.00$ <br />Excavator 1 860.44$ 860.44$ <br />On Site utility check 1 510.00$ 510.00$ <br />Cost Summary:Amount: <br />Labor:2,081.92$ <br />Material & Equipment:1,831.66$ <br />Subtotal:3,913.58$ <br />Overhead: 10.0% 391.36$ <br />Profit: 5% 215.25$ <br />COP Total:4,520.18$ <br />Total does not include WA State Sales Tax <br />Work will not proceed until this COP is included in an executed change order updating the contract price. <br />This COP: 4,520.18$ <br />Other Pending COP's: <br />Total Pending COP's: 4,520.18$ <br />Authorized Signature:Date: <br />Owner or Owner's Representative <br />Authorized Signature: Date: <br />Valdez Construction, Inc. <br />Reservation of Rights. This change order proposal is based solely on direct cost elements such as labor, material, and normal markups, and <br />does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead acceleration, and/or <br />impact costs which are not possible to assess at the present time. Right is expressly reserved to make claim for any and all of these <br />related items of compensable cost overrun prior to final settlement of this Contract. <br />Change Order Proposal <br />499 NE Midway Blvd. Ste. 2, Oak Harbor, WA 98277 <br />Phone: (360) 679-3000 Fax: (360) 679-2589 <br />COP #4 is to dig 5 test holes for methane gas monitoring. Valdez construction will provide equipment, labor and <br />materials (ABS Pipe, Band Clamps, 2- 50lb bags of concrete per hole and sand) to help install test equipment. <br />In the event that the time is less or grater than due to unforeseen condition the cost will be adjusted <br />accordingly.
The URL can be used to link to this page
Your browser does not support the video tag.