Laserfiche WebLink
41) <br /> We have completed the intake screeningfor the project at 1231 ColbyAve B2406-003 .This email will <br /> p � ) <br /> serve as the building department intake correction letter.The comments below should be addressed <br /> before we could start residential building review. <br /> Comments: <br /> 1. Please provide complete floor plan for review. It appears to be a repair at basement,then <br /> please provide complete basement floor plan with north arrow for reference.These will be <br /> provided on Monday June 24. <br /> 2. Please indicate on the floor plan from where to where you will repair the wall accordingly. South <br /> and West walls of the southwest room of the basement <br /> 3. Is the flood from upstairs? No.Or due to a fire damage? No.Any damage on the floor? No. Only <br /> the carpet on the slab floor of the basement was damaged. Please indicate accordingly. Photos <br /> could be helpful as well. <br /> 4. Please indicate which room is conditioned and finished room for review.The southwest room of <br /> the basement has the repairs. <br /> Please refer to the link below for resubmittal instruction.And the drawing should be clear, and all notes <br /> should be eligible: <br /> Permit-Application-Submittal--Re-submittal-Instructions-PDF(everettwa.gov) <br /> If you need schedule an appointment with us,you could click the link below: <br /> https://www.everettwa.gov/2692/Schedule-an-appointment <br /> Feel free to reach out if any questions or concern.Thank you! <br /> Yin <br /> <image002.png>Yin Lu, R.A. <br /> Associate Engineer—Building Plans Examiner I Permit Services <br /> 425.257.7299 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> Phone Hours: M/W/Th:8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Category 2:For official use only/disclosure permissible by law. <br /> 2 I 2 <br />