My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1231 COLBY AVE 2025-01-09
>
Address Records
>
COLBY AVE
>
1231
>
1231 COLBY AVE 2025-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 11:58:19 AM
Creation date
10/17/2024 8:31:47 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1231
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n TA <br /> • <br /> D <br /> Li <br /> TO: Yin Lu R.A. <br /> FROM: Regina and Jorge Chacon <br /> 1231 Colby Ave. CITY OF EVER <br /> Everett, WA 98201 Permit Sc v c,S <br /> RE: Addressing Corrections requested on permit B2406-003 for repair of <br /> framing in basement that had flooded <br /> The shower valve in the basement bathroom was leaking into the existing <br /> adjacent room when we took possession of the house. We don't know <br /> how long it had been leaking. When we removed the soaked carpet on <br /> the basement slab, we found the bottom plates, the bottom of the 2x4 <br /> studs and the existing paneling had all been damaged by the water. We <br /> have replaced the 2x4 walls with 2x6 studs and bottom plates. We will use <br /> R21 value insulation and 1/2" gypsum to decrease heat loss. Since we <br /> had to repair the walls, we chose to update the electrical wiring for that <br /> room. (Permit# E2405-137). When Mike came to inspect the electrical <br /> work, he told us we needed a building permit for the repair of the walls. <br /> In addition, since the discovery of the leak and damage, we previously <br /> updated the bathroom in the basement (with permits # B2205-043, <br /> P2205-010, M2205-032 and E2403-284) to repair the leak and update the <br /> fixtures. This has all been inspected and approved. <br /> There was no damage to the slab floor. <br /> On the plan drawing, we have indicated by cross hatch (see legend) which <br /> walls were repaired. These are the south and west walls in the SW corner <br /> of the house. <br /> We will be bringing in the plans with the additional information on Monday <br /> June 24. <br /> Thank you, <br /> Regina and Jorge Chacon <br /> 206-370-0811 <br /> r!r V OF E :7:RE,'-r <br />
The URL can be used to link to this page
Your browser does not support the video tag.