My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 80TH ST SW 100 JAMCO 2025-01-23
>
Address Records
>
80TH ST SW
>
1111
>
JAMCO
>
1111 80TH ST SW 100 JAMCO 2025-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 9:58:45 AM
Creation date
10/25/2024 8:18:27 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1111
Unit
100
Tenant Name
JAMCO
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f . . <br /> ' � stru itor Specflcatonrtt- <br /> JAMCO AMERICA-1.1.11 80th St. SW <br /> 1111 80TH ST SW <br /> EVERETT,WA 98203. <br /> Specifications For CentiMark RoofBond F.M1-90 System t <br /> Sections included:Entire Roof <br /> Project Preparation: <br /> Perform a pre job meeting to determine jobsite logistics and safety requirements. <br /> Furnish proposed construction schedule;if needed. <br /> Furnish,and install proper safety equipment in accordance with Centimark's written safety program. p. <br /> Safety Related <br /> Furnish and install warning lines to identified area associated with ground related roofing activities.. <br /> Store roofing materials in accordance with good roofing practices. Material placement will be to distribute weight <br /> loads throughout the entire roof area. <br /> Surface Preparation: <br /> Deck areas not capable of providing a acceptable:substrate for the installation of the new roof it will be replaced at a <br /> unit cost of$3.00 per square foot.Areas of removal/replacement will be approved by an Owner's representative. <br /> Remove existing sheet metal copings and dispose of debris. <br /> Insulation Attachment: <br /> Furnish and install a layer of 1/2" ISO roof recover board insulation, (R-Value 2.8). This layer of insulation will <br /> be mechanically attached to the prepared substrate utilizing FM Global(FM) approved 3"plates and fasteners. <br /> Systein:Application: <br /> Furnish and install.CentiMark 60 mil reinforced,TPO roof metiibrarie. <br /> Position the TPO membrane over the prepared substrate and allow the membrane sufficient time to "relax" prior to <br /> installation. <br /> Install the new TPO membrane over the prepared surface. Secure the membrane in place'by welding it to the plates <br /> utilizing induction methodology on 2 foot centers. This will create a roof assembly whereby no penetrations <br /> shall be made to the membrane! 9 <br /> The thermoplastic membrane seams will be overlapped a minimum of 5", then hot air welded together.Weld width <br /> shall be a minimum.of 1.5" in width for automatic machine welding: Weld width shall be.2" in width for hand <br /> welding.Upon completion of welding,each seam shall be probed to ensure proper securement. <br /> Pipes Less Than 6"in Diameter <br /> Furnish and install new prefabricated thermoplastic pipe boot secured at the top with a stainless steel screw type <br /> clamn adhered to the field sheet 0 9 <br /> 1 t <br />
The URL can be used to link to this page
Your browser does not support the video tag.