Laserfiche WebLink
411 <br /> Stacks,Greater Than 6 .InDiainct <br /> FurniSh and install,a mil,non-reinfOrced thermoplastic fiaShing,‘vhere applicable <br /> Miscellaneous Proj actions <br /> Furnish and install thermoplastic flashtgs to the roof prOjection.S.Upon completion of welding, each scant shall be <br /> probed,to ensure proper securement <br /> Fattish and install thermoplastic?lashings to the toof Fojeetions.Upon completion of welding, each seam shall be <br /> probed to ensure-proper securement <br /> Ftunigt and install at the base of the unit round plates to be mechanically attached to the deck and the around the <br /> perimeter of the projedtion,'The membrane will then be attached to the plates via the induction welding process. <br /> Tustali prefabr,icAted-10,:iversal.comers for reinforcement, 9 9 9 <br /> Puma arid install a wide TFO protective mat at rooftop access points. <br /> 1Parap et Wall Detail <br /> Furnish and install,2.3/8"round seam plates or l"wide polymer batten strip to the field sheet at the base of the wall, <br /> A second piece of membrane will be adhered to the wall,:weIded to the field sheet and a new coping, <br /> furnish and install new prefabricated thermoplastic pipe boot secured at the top with a stainless steel screw type <br /> clamp adhered to the field,sheet <br /> Furnish:and install a:60 mil,rim-reinforced thermoplastic:flashing,where applicable: <br /> Furnish and install thermoplastic flashing to the roof projections Upon completion of welding, each seam shall be <br /> probed to 61iSlite. proper$00tiratiCtIt. 9 9 <br /> Furnish and install supports and protection pads under conduit lines, gas lines and free standing units -where <br /> necessary, <br /> $lusgeN:#0141q.ce,sstiries <br /> Furnish and install new 24 Page.P,Te-fittishod galvanized steel coping with continuous cleat Choice of color to be <br /> Selected byowner frail a standard OW Chart <br /> Furnish and install new 24 gauge white themaoplastio coated metal fabricated scupper 14M1g$. <br /> Standard Operatitg Prwaws; • <br /> fl'iployee.Professiondism: <br /> All wext.Shall be performed in a safe,professional manner in compliance with Centimarkpolicy. <br /> Permits <br /> CentiAlark will supply the necessary permits for the project. <br /> Nightly Tie-bits <br /> Depending on new roof system being installed, temporary water cut-offs are to be constructed at the end of each <br /> working day to protect the newly installed roof system:and building interior. <br /> Clean Up <br /> All'work premises will be cleaned:daily during the constmctionprocois and at the completion of the project <br /> lob:AcUptioice and.Punch list <br /> Conduct a post job Walk through for final sign-off of our job completion form. <br /> 4 <br /> 51(ft <br />