Laserfiche WebLink
4. RIGHT OF ENTRY. The Owner hereby grants permission to the City and its agents, <br /> representatives, and/or contractors to enter upon the Property for the purpose of the surveying <br /> and monitoring described above. This includes without limitation the right to install monitoring <br /> equipment and to operate and maintain such equipment on the Property. Except in the case of <br /> an emergency, City shall provide 48 hours notice prior to entering onto the Property. <br /> 5. NO ADMISSION OR WARRANTIES. The City is entering into this Agreement solely <br /> in settlement of valuation disputes. The City does not by this Agreement make any <br /> representation about any vibration or any other matter that may or may not be caused by the <br /> Project and the City by this Agreement does not undertake to take any actions regarding any such <br /> matters. <br /> 6. MISCELLANEOUS. This Agreement may not be assigned by the Owner. This <br /> Agreement may be signed in counterparts. Scanned copies of a signature or an e-signature on <br /> this Agreement will be considered the same as an ink signature. This Agreement may only be <br /> modified by a writing explicitly stating it is a modification to this Agreement. Except for the <br /> temporary construction easement referred to above, this Agreement represents the entire <br /> agreement between the parties relating to the Project and supersedes all other representations <br /> made prior hereto. <br /> {signatures on next page) <br /> 3 <br />