My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5510 S 3RD AVE 2024-11-08
>
Address Records
>
S 3RD AVE
>
5510
>
5510 S 3RD AVE 2024-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 11:32:32 AM
Creation date
10/29/2024 11:58:38 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5510
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLUE RAVEN <br /> An <br /> 1403 N 630 E <br /> Sister upgrade is required for O(800 Utah 84097 <br /> 800) 377-4480 <br /> (MP1) on all rafters that directly BlueRavenSolar.com <br /> 1X DECKING OR SHEATHI\G <br /> support solar PV. Stitch new <br /> 2x6 DF#2 (min) to existing <br /> (N) INSTALL SIMPSGN A34 CLIP. <br /> member. See detail for <br /> additional information. 0 <br /> (E) RAFTERS :D <br /> (N) SISTER MEMBER TO BE FULL Q 2 <br /> INSTALL END GROUP OF LENGTH,ATTACH TO(E)RAFTER W/ } <br /> FASTENERS WITHIN 6"OF T x3'WOOD SCREWS STAGGERED U <br /> EACH END,(3)SCREWS MIN TOP AND BOTTOM 16"D.C. L <br /> O (y)C14 CD <br /> cn <br /> _ � 4-- <br /> (E) CEILING JOIST >✓ C } } <br /> SISTER TO BE WITHIN 3"OF } 4— <br /> TOP OF CEILING JOIST OR a) <br /> TOP OF WALL y L u U <br /> OPTION 1 - FULL LENGTH SISTER w 3 IL <br /> SEE-ETTER FOR UPGRADE LAP LENGTH AND SIZE, } <br /> L 6 } <br /> > } U <br /> Q D <br /> 0 <br /> � > <br /> 1X DECKING OR SHEATHING LLJ <br /> t/> c�i) <br /> O E <br /> (N) INSTALL SIMPSON A34 CUP. 0 <br /> LO <br /> } O <br /> a C <br /> (E) RAFTERS (N) SISTER MEMBER TO BE FULL Z N <br /> LENGTH.ATTACH TO(E)RAFTER W/ U <br /> INSTALL END GROUP OF 1'x3"WOOD SCREWS STAGGERED O r <br /> TOP AND BOTTOM®16"O.C. <br /> FASTENERS WITHIN 6'OF <br /> EACH END,(3)SCREWS MIN a I= <br /> PROJECTID: <br /> 977295 <br /> PV DC SYSTEM SIZE: <br /> (E) CEILINGJOIST 3.360 kW DC <br /> SISTER TO BE WITHIN 3'OF PV AC SYSTEM SIZE: <br /> TOP OF CEII ING JOIST OR ` A. C4 1 2.600 kW AC <br /> TOP OF WALL Sealed For WAg v REVISIONS: <br /> OPTION 2 - OVERLAPPED SISTER. tip o �t c{� Al -- <br /> SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE. Existing Roof & <br /> (N) SISTER RAFTER Attachment Onlv 0 <br /> 46056 <br /> � <v� DRAWN BY: <br /> (N) SISTER RAFTER (E) RAFTER S S � Brendan Fillmore <br /> SECTION A-A Sj0NAL ENG� PLOT DATE: <br /> May 16, 2024 <br /> S1 SISTER UPGRADE OPTIONS DRAWING TITLE: <br /> 8"'24 Structural <br /> ALTERNATIVE FASTENER SCHEDULE; 10d NAILS STAGGERED TOP AND BOTTOM AT 6"O,C, <br /> DRAWING NUMBER: <br /> P V <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.