Laserfiche WebLink
Jose Villagomez <br /> Cascade Cleanup and Restoration, Inc. <br /> Plan Check Number: B2106-009, First Building Review <br /> October 12, 2021 <br /> 15. See Sheet A-1, S-1, and S-2. It appears that the location of the post footing for the 4x10 floor <br /> beam is not located in the correct location. Foundation plan shows posts 5'-3"apart but Sheet <br /> A-1 and S-2 shows the posts 6'-6" apart. <br /> 16. See Sheet S-3. Provide a detail of how lower roof of the covered porch/laundry room is <br /> connected at the 2-story wall. R106.1.1 <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Rakeeb Khan <br /> Residential Plans Examiner <br /> (425)257-7299 <br /> rkhan@everettwa.gov <br /> S:\RKhan\2021\B2106-009—Rl.docx <br /> 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 5 of 5 <br />