Laserfiche WebLink
sides survey markers will be required to be staked at the property corners prior to <br /> construction.This is to verify encroachment into the side setbacks does not happen during <br /> construction. <br /> Once the height of the proposed residence is revised if the height is over 27-feet a base <br /> elevation survey will also be required prior to permit issuance (see attached) and a height <br /> survey will be required prior to framing inspection. <br /> 3. Site Plan. Please see the attached site plan checklist for further details. <br /> a. Height Calculations. Benchmark shall be a fixed point or datum point such as the top of <br /> a utility cover, monument in road, or other permanent point that cannot be easily <br /> moved or difficult to re-locate. Label on site plan where the benchmark and base <br /> height markers are taken from; <br /> b. Note length of eave overhangs (Maximum encroachment into side setbacks is 18- <br /> inches). <br /> The interim permit intake/resubmittal policy is available on the Permit Services Page. Please submit <br /> at minimum two (2) paper copies of any revised documents/plans. For general permit questions, <br /> please contact Permit Services at permitservices(@everettwa.gov or 425.257.8810. <br /> Best Regards, <br /> Grace Pollard <br /> Associate Planner I Planning Division <br /> Community, Planning, and Economic Development Department <br /> 425.257.8731 1 2930 Wetmore Avenue, Suite 8A, Everett, WA 98201 <br /> everettwa.gov/planning I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure <br /> pursuant to the Public Records Act. <br />