Laserfiche WebLink
- ;ECIEOVE <br /> CITY OF EVERETT <br /> MAY 232024 <br /> EVERETT Permit Services <br /> WASHINGTON CITY OF EVERETT <br /> Permit Services <br /> SUMMARY OF REQUIRED IBC SPECIAL INSPECTIONS <br /> PER 2018 INTERNATIONAL BUILDING CODE (IBC) <br /> PROJECT Cummins/Everett PERMIT# <br /> ADDRESS 3717 McDougal Ave Everett WA 98201 DATE 5/14/2024 <br /> Summary Statement of Special Inspections <br /> In accordance to Section 1704.2.3, the applicant shall submit a statement of special inspections as a condition for permit <br /> issuance. When special inspection is required to be performed, the owner, or the registered design professional in <br /> responsible charge acting as the owner's agent, is required to hire an independent testing/inspection agency to perform <br /> required special inspections. <br /> The independent agency hired to perform the duties of special inspection is required to be a registered agency with <br /> Washington Association of Building Officials(WABO),under the Special Inspection Registration Program(SIRP)Standard <br /> No. 1701 or most current adopted special inspection standard published by WABO. <br /> The design professional shall complete the attached forms and submit them to the Building Department prior to issuance <br /> of the building permit.The special inspectors assigned to any project within the Jurisdiction shall be currently registered <br /> with WABO and certified for the disciplines assigned. <br /> The Schedule of Special Inspections summarizes the Special Inspections and tests required. Special Inspectors will refer <br /> to the approved plans and specifications for detailed special inspection requirements.Any additional tests and inspections <br /> required by the approved plans and specifications will also be performed. <br /> A Final Report of Special Inspections documenting required Special Inspections, testing and correction of any <br /> discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy(Section <br /> 1704.2.4). <br /> Prepared by: <br /> Registered Design Professional in Responsible Charge: Basil Kattula <br /> The following are the testing agencies and special inspectors that will be retained to conduct tests and inspection on this project: <br /> Responsibility Firm Address, Telephone, e-mail <br /> 1.Special Inspection AAR Testis <br /> Agency(except for g 7126180th Ave NE Suite C-101 Redmond WA <br /> geotechnical) 98052 425-881-5812-dispatch@aartesting.com <br /> 2.Material Testing Agency <br /> (Laboratory) <br /> 3.Geotechnical <br /> Inspection Agency <br /> 4.Other <br /> 5.Other <br /> GENERAL INFORMATION: <br /> • Obtain a building permit before starting construction. Ce 1 of <br /> Form created <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that r . <br /> may be required per 2018 IBC.Additional information can be found at your local building department. eCityGov.net <br />